Search Permits
244,860 results
New 1-inch water service line with a new ¾ - meter.
Adding 16 Push Piers to help stabilize the foundation at existing SFR. Special instructions required.
Bathroom remodel like for like.
Install (2) Electric Pedestals 100A SES in Parcel F. Light pole and foundation will be under separate permit.
THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION FIELD OFFICE FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL IS JANUARY 31, 2026 .
Remove and replace rooftop cooling towers and racks. New plumbing. Results in CoC.
Civil offsite improvements for a 50.5-acre development consisting of one industrial building with associated truck and vehicular parking. REF: PMT25-21631 for Civil Onsite. (2) new 2-inch landscape meter. Results in CoC.
Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. DATE: 10/9/2025 ADDRESS: 5217 E DRAGOON AVE MESA DAMAGE CAUSED BY: Wind INSPECTED BY: Richard Lemcke The inspection of the site identified the following: This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any alterations or changes will require submitting plans before any restoration can begin. During the damage inspection the fo
Gas permit for existing mobile home. New 55-ft run of CCST to 57,000 BTU burner range. Permit to include new stub to future 36,000 BTU water heater not installed at this time.
Group A-1 occupancy. Type V-B construction. 2,400 SF. Occupant load 152. Enclosing 214 SF outdoor front patio with 42" steel fence and new swinging gates to create outdoor dining area. Certificate of Occupancy to be issued for new patio and building tenant improvement (PMT24-20337). Results in CoO.
Demo existing light pole and install new light pole for new cell tower equipment. New 8 foot CMU Foundation Wall, attached to existing building, for perimeter of new cell tower site. New diesel backup generator, stepdown transformer, UL Listed 3-bay walkup cabinet, fiber cox New antenna, electrical system ATS, underground electrical conduit. New 200A 1 phase electrical meter. Special Inspections Required: Soils, Steel Construction, Concrete Construction, Cast-in-place deep foundations, and Maso
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S AND INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE
Install new Verizon Wireless electrical equipment on an existing light pole. Results in CoC.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
New illuminated monument sign at new building. New electrical, structural, and architectural. Signs shall be installed per NEC 2023 with UL listed components. Ref BOA25-00845 for CSP.
Like-for-like repair of SES wiring Re-Installation of three 4" condulets, 4" EMT conduit, three parallel feeds of 500 mcm copper, black, red, blue, white, green Restalled bond bushings inside SES, torqued all connections
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Like for like replacement of the 400amp (4) meter pak panel supplying power to units #37, #38, #39, & #40. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
Replacing 2 Ton (Gas) HVAC system. Bryant equipment 70,000 BTU heater
Replacing 2.5 Ton (Gas) HVAC system, 70,000 BTU Heater, Bryant equipment
New electric water heater
New electric water heater
Replacing the condenser, gas furnace and evap coil
Replacing 2 condensers and 2 air handlers
2 ton heat pump replacement
Wire new addition Install new A/C circuits, circuit for lighting, circuit for radiant heater. Total circuits 14 Add new 200amp main lug sub panel to handle new circuits.
2 ton electric system replacement
3 ton gas system