Search Permits
12,422 results · type: electrical
INSTALLATION OF A 80 AMP CIRCUIT BREAKER ON THE MAIN PANEL FOR A NEW SUB-PANEL. INSTALLATION OF A 50 AMP CIRCUIT BREAKER ON SUB-PANEL FOR ABOVE GROUND SPA. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLIN WH aPOWER 2 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE
PERMIT IS ONLY FOR INSTALLATION OF ONE ENPHASE IQ BATTERY 5P. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND C
PERMIT IS ONLY FOR INSTALLATION OF ONE FRANKLINWH APOWER2 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL BATTERY. PERMIT DOES NOT INCLUDE DERATE. CONTRACTOR AND THE SERVING UTILITY WILL COORDINATE TURNING POWER ON/OFF WITHOUT A CLEARANCE FROM THE CITY FOR DERATE. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM.
THIS PERMIT IS ONLY FOR THE INSTALLATION OF TWO (2) TESLA POWER WALL3 BATTERY INCLUDING A NEW 200A SERVICE PANEL UPGRADE. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION.
THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWERWALL BATTERY. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION.
THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL3 BATTERY. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION.
INSTALLATION OF A 60 AMP CIRCUIT BREAKER FOR A FORD CHARGE STATION PRO VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
INSTALLATION OF A 100 AMP CIRCUIT BREAKER FOR A 125 AMP RATED NEW SUBPANEL. INSTALLATION OF A 60 OF A 60 AMP CIRCUIT BREAKER ON THE SUB-PANEL FOR A CHARGE POINT HOME FLEX VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR INSTALLATION OF ONE FRANKLINWH APOWER 2 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE SOLAR EDGE BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHAR
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)