Search Permits
12,422 results · type: electrical
This permit is to relocate and upgrade to a 225A service panel. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. Permit does not include PV solar system insta
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
Main Panel Upgrade 200AMP - 200AMP Same Location Like for Like
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. IF EQUIPEMENT IS MOUNTED TO AN H-FRAME THE H-FRAME SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH T
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
electrical_permit_(r)
This permit is to upgrade to a 225A service panel with a 200A breaker. Installation shall comply with city of mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. Permit does not include PV solar syste
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
PERMIT IS ONLY FOR INSTALLATION OF ONE SOLAREDGE ENERGY BANK BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FE
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE HOME HUB INVERTER. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOU
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
electrical_permit_(r)
INSTALLATION OF A 50 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2018 IBC, 2017 NEC AND SRP STANDARDS.
Sega 24kw Generator Installing a new 24kw backup generator with a subpanel, automatic transfer switch, and a dedicated gas line at existing SFR.
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
INSTALLATION OF A 60 AMP CIRCUIT BREAKER FOR A FORD PRO CHARGER STATION IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
PERMIT IS FOR MAIN PANEL UPGRADE TO 225A AND THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR S