Search Permits
243,291 results
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
[A B 2533] - Legalization Attached A D U
Replaster Pool, New Tile. Install New Coping And New Pool Cover.
New Aluminum Combo Louvered Roof System With Insulated Roof Attached To (E) Dwelling Wall.
Install (N) Elec. Branch Circuit From Electrical Panel To A (N) 80 Sf Detached Shed. Install Underground Circuit, Provide Int. Recep., Lighting, & Switches.
Addition To Bedroom, Living, And Suite. Roof Raise And Reconfig. Relocate Stairs, Powder Room, And Fireplace. Related To Bp#180601
Legalize Existing J A D U [A B 2533]
CONSTRUCT A 458 SF SWIMMING POOL & 49 SF SPA. GAS ON SEPARATE PERMIT. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
New detached 468 SF deck per attached engineered plans. No electrical, plumbing, or mechanical improvements. Minimum required building inspections: Footings, strap/shear, frame and final. If needed, underground electrical and plumbing.
Guest bathroom tub-to-shower conversion with 60x34 preformed shower base, no drain relocation, no structural changes. Wall system to 84-inch height. Teak seat installation included. Vanity/countertop replacement with countertop, sink, faucet, and mirror replacement at existing SFR.
Build (16) Group U occupancy garages totaling 22,351 SF Group B occupancy 768 SF Clubhouse, and Group U occupancy 256 SF Ramada. Apartment buildings by separate permits. All structure Type-VB construction with tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. As a result of C of O.
Install (2) exterior wall mounted non-illuminated signs with pan channel lettering: CERRIS SYSTEMS W/LOGO on south elevation 41 sf and east elevation 78.29 sf.
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. Results in CofC
Previously remodeled interior work with no change to overall square footage. Primary closet conversion into new bathroom and closet. Family room conversion into new bedroom. Minor exterior electrical work. Minimum required building inspections: Electric rough in and electric final, frame, and final. If needed, underground plumbing.
Tenant improvement in existing 2-story, 4,864 SF, type VA construction, A3 occupancy Clubhouse and fitness room with accessory B and S2 occupancy. Modifications include demo of existing walls to open up space to into larger assembly areas, new cosmetic finishes such as flooring, (1) new ADA restroom, clubroom kitchenette area, larger fitness center area, new storefront entries and openings for windows. Special inspection req. steel and concrete. Non fire sprinklered building. Results in CoO.
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. New MEP. Results in CoC
Converting a 576 SF detached garage into an ADU. Included Mechanical, Plumbing and Electrical improvements.
RELATED TO COD26-00357 Add a half circular driveway the new driveway will be reduced to 12 feet and the original driveway will be reduced to 17 feet, add concrete for entrance to to side RV gate. Move rear entry gate to the face of the house. Fill in the rear wall. All concrete will be replaced with dirt and artificial grass on the driveway area per plans.
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. New MEP. Results in CoC
Installation of 50-ft of 2-in galvanized gas line, surface mounted on wall up to attic, 75-ft of 2-inch CCST inside attic, 15-ft of 2-inch galvanized piping, surface mounted from outside attic down to existing 400k BTU pool/spa heater. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.