Search Permits
12,422 results · type: electrical
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND 225-AMP MAIN PANEL UPGRADE. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIO
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
electrical_permit_(r)
electrical_permit_(r)
INSTALLATION OF A 60 AMP CIRCUIT BREAKER FOR A FORD CHARGE STATION PRO VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE SOLAREDGE HOME BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. IF EQUIPEMENT IS MOUNTED TO AN H-FRAME THE H-FRAME SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE
PERMIT IS ONLY FOR INSTALLATION OF ONE POINT GUARD BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHA
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
INSTALLATION OF A 50 AMP CIRCUIT BREAKER FOR A NEMA 14-50 OUTLET AND BLINK MQ 200 VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR INSTALLATION OF ONE ENPHASE IQ 5P BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND C
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 INTERIOR BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAI
electrical_permit_(r)
THIS PERMIT IS TO UPGRADE TO A 225A SERVICE WITH 200A BREAKER AND INSTALLATION OF TWO (2) TESLA POWERWALL 3 BATTERIES . INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMENTS. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR PERMIT. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION
INSTALLING ONE (1) TESLA UNIVERSAL WALL CONNECTOR INSTALLED INSIDE GARAGE AND (1) TESLA POWER SHARE GATEWAY INSTALLED OUTSIDE. INSTALLATION OF (1) ONE NEW 200A SUBPANEL. 3/4 MT CONDUIT APPROX 50' THROUGH THE ATTIC FROM GATEWAY TO TESLA WALL CONNECTOR. TESLA WALL CONNECTOR & TESLA POWER SHARE GATEWAY 3V TO BE INSTALLED PER MANUFACTURE SPECIFICATIONS AND PER UTILITY COMPANY SPECIFICATIONS. ALL WORK TO BE PERFORMED PER CITY OF MESA ADOPTED 2018 INTERNATIONAL CODE COUNCIL (ICC) FAMILY OF CODES,
Upgrading existing SFR from a 200 AMP to 400 AMP main panel
PERMIT IS ONLY FOR THE INSTALLATION OF ONE ENPHASE IQ BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDUL
Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep. (using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE WITH 200A BREAKER AND INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. BESS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPE
Replacement of 200 Amp (or less) electric panel & weather overhead - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility
electrical_permit_(r)
electrical_permit_(r)