Search Permits
11,718 results · type: mechanical
Remodel to pre loss condition: like to like replacement of existing HVAC plumbing electrical and interior finish with no structural modification. Existing multifamily unit.
Interior Remodel Ground level - Kitchen remodel includes removal of some existing non-load bearing closet walls. Doorway cut into existing wall for proposed back kitchen all new appliances cabinetry lighting and plumbing fixtures. Moving plumbing locations. Primary bathroom remodel new shower tub relocated vanity sinks new entry door cut to master closet.
Interior remodel of existing office space. (2 Apps - Suite 420 and 430)
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review- Renovation to an Existing warehouse Structure fore New Food Service and Wellness (North Bldg).
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Rheem Prestige 4-Ton Gas Heat Split System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Rheem 1.5 Ton Gas Heat Split System
New two-story SFR (4br/4.5ba) with attached garage pool and covered patio; and new two-story accessory structure (.5ba)
mechanical
mechanical
INSTALL HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water source heat pump, piping, and accessories in accordance with the per plans.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of Outrigger platform for deck formwork as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
Installation of temporary contractor field office and workers/ contractor sheds/ shanties at 1st & 2nd floor as per BC 3303.16 during construction of New Building filed under M01230881-I1 No change in use, egress and/or occupancy.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Alterations to mechanical system on 7th and 9th floor as per plans. No change to use, egress or occupancy.
proposed mechanical and electrical work for proposed eating and drinking establishment, accessory kitchen and mechanical equipment at 1st, cellar and mezzanine respectively
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 17TH FLOOR (ROUX) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Fit out of three floors with new ductwork and air conditioning units. No change to use, egress, or occupancy.
Installation of chute in conjunction with Q01324338 - no change in use, egress, or occupancy under this filing