Search Permits
14,651 results · type: mechanical
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Installation of temporary single personnel hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
Installation of temporary vertical debris/ safety netting panels as per plan submitted. No change in use, egress and/or occupancy with this filing.
removal and replacement of rooftop unit as well as associated duct and piping.
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Installation of debris chute submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL NEW VRF HEAT PUMP SYSTEM FOR HEATING AND COOLING ON FLOORS 1-4. CONDENSING UNITS ON ROOF, DUCTED AND WALL INDOOR UNITS, NEW DX COIL IN EXISTING STUDIO AHU-1, REFRIGERANT AND CONDENSATE PIPING AND CONTROLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MODIFICATIONS TO INCLUDE REPLACEMENT OF THREE (3) ROOFTOP HVAC UNITS AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Direct replacement of a 17.5 ton rooftop HVAC single package unit.
Upgrade to Chillers as shown on plans.
BUILDING RENOVATION DUE TO FIRE AND WATER DAMAGE. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY.
Removal and installation of ductwork, diffusers, fans, A/C unit and related mechanical piping. No change to use, egress or occupancy.
Radon mitigation system. No change in use or egress.
INSTALLATION OF HVAC MECHANICAL SPLIT SYSTEM WITHIN EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF AC UNITS AS PER PLAN. NO CHANGE IN USE, EGRESS OROCCUPANCY.
TI Turnkey - Sessa Capital - Mechanical work on the 40th floor as indicated on drawings.
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of complete existing central heat and air system with or without duct work There is no unit listed. It is under the main address for the MAINTENANCE SHOP.
Replacement of complete existing central heat and air system with or without duct work Replacement of Hvac system.
Replacement of complete existing central heat and air system with or without duct work Change out like for like
ePlan: Residential Expedited Review - Three Unit Corner Bldg (100 E. Home Pl) New construction of 2-Story Single Family Res. [3bed 3.5bath] with Attached Garage
Replacement of complete existing central heat and air system with or without duct work Avion Rhoden - Upstairs Unit
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work This change out does not have a unit number. It is located in the GYM - located at the main office address.
Addition to existing 1-story single family residence with interior remodel. Adding bedroom and kitchen 5 bed/4.5 bath Retroactively permit attached covered carport
Unit 2205 3 story 3 bedroom 3 bathroom townhome building using the 5-Plex C prototype is plan 1499L
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Ronny Reese