Search Permits
16,709 results · type: electrical
Interior alteration of approx1579SF of existing interior space
EXPRESS: Replace siding replace windows size for size.
PANDA EXPRESS M1
Interior remodel of SFR - interior renovation of existing structure. Interior walls to be removed and reorganized. Windows to be replaced. New window and door openings to be installed in exterior walls.
ETJ - upgrade electrical service replacing panel and meter
Level 2 EV Charger
interior alteration of an existing office space inclusive of (1) new demising wall [SMALL PROJECT]
Express: Repairs due to fire damage (like for like repairs layout staying the same and no fixtures are being relocated)
homebuilder loop REF: 2026-123074 BP
Replace and upgrade existing main panel on house to 200A. Add 60A sub-panel via underground feed to detached garage for lighting and receptacles.
Provide Electrical power for future E-Bike share station
Upgrade of existing underground electrical service to 150 amp 120/240 volt and current codes and standards.
***On Hold needs commercial permit and possible building permit for siding replacement ON HOLD ***Remove and reinstall service after wet siding is removed and repaired.
T-pole Ref: 2026-099454 BP
two 200amp panel replacements. No meter work done. AE is the electrical provider.
Install Level 2 EV Charger
Replace/upgrade service
New pool Bldg 1
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
PANDA EXPRESS S3 on north facade
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF TWO ENPHASE IQ 10C BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
80.064kW - Tesla Solar Roof at existing SFR including (6) Powerwalls and (6) Expansion Packs
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Installation of (1) Tesla Power Wall 3 Battery w/ Tesla Backup Switch
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S