Tenant Improvement 1193 SQ Ft (Vacant Space to Restaurant). Deferred fire sprinklers.
Scope of work includes the tool install for the phase 3 Nomaflex line. Scope includes the installation of a pump and electrical distribution to power the phase 3 Line. The scope also includes safety and regulatory compliance requirements to deliver an operational manufacturing facility and establish the infrastructure needed for future expansion
Install one Non-illuminated Logo and Lettersets on Front Elevation of Building STATE FARM RYAN JOFFE 15 sq. ft. and one Non-illuminated Logo and Lettersets on Side Elevation of Building RYAN JOFFE 7 sq. ft. and reface existing signage on both East and West facing sides of the monument.
Interior fitout of one data hall and the addition of the second equipment yard on the East side of the building. Architectural scope includes the interior fitout of the data hall and its associated mechanical galleries as well as several storage rooms. Scope also includes new screen walls enclosing the East yard. Civil scope includes grading around the East yard and concrete sidewalks. Mechanical scope includes new equipment inside the data hall galleries and new chillers on the rooftop dunnage
install mini split with 20A circuit breaker
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER LIKE-FOR-LIKE IN GUEST BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Install six internally illuminated LED channel-letter sign sets on canopy-mounted raceways for First Watch: Signs A and B on the south elevation, C and D on the west elevation, and E and F on the north elevation. Apply three nonilluminated door-vinyl logos. Replace two tenant panels, one set, in an existing double-faced monument with routed aluminum and white acrylic backing, identified as Sign G. Refer to the attached Anchor Sign R10 drawings dated September 28, 2026 for proposed materials, dim
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PLUMBING PERMIT COVERTING SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Fabricate & Install (1) set of Illuminated Channel Letters
PLUMBING PERMIT TO CONVERT TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES. USING SHOWER ROD. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Install manual fire alarm system with occupant notification devices in a temporary dining tent with a Group A-2 occupancy and no fire sprinkler system. System primarily powered by temporary generators and backup batteries. Approved with Stipulations IFC 901.4: Provide four (4) exterior horn/strobe notification appliances, with one installed on each side of the tent structure. Fire alarm system shall always remain fully operational and compliant with required standards (24/7).
C02 GAS DETECTION SYSTEM FOR EXISTING TO REMAIN BULK CO2 TANK
AFP26-01281 Replacing two exhaust fans and four air handling units with equipment of similar capacity.
PLUMBING PERMIT FOR GUEST BATHROOM. TUB TO SHOWER CONVERSION WITH 60 X 30 LOW PROFILE SHOWER PAN, LEFT DRAIN, NO DRAIN RELOCATION. INSTALL THREE NEW SHOWER WALL PANELS AND SLIDING GLASS DOORS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
NEW 1715 SF SINGLE STORY RESIDENCE WITH A TWO CAR GARAGE AT HAWES CROSSING. PLAN HAS A CORNER LOT OPTION. NEW WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTIONS FOR POST TENSION SLABS. SEE MST23-15241 FOR HAWES CROSSING 2 PARCELS A, B, D AND E. ADDENDA MST25-01481 ADD PARCEL H & F. Ref: MST26-07843 for 2024 code update.
System modification, remove existing nozzle over griddle and replace with nozzle for a new range
Replacing main water service line from the meter to the main riser up to 30'
Building 3: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
This permit is for installation of the temporary protective fence only. No grading, plant removal, or construction shall begin until a separate construction permit is issued. Temporary protective fence is required to remain in place at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Ref custom home permit: PMT25-04925.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a CCTV system with 4 hardwired cameras. 4 wall mounts, and 1 8k NVR
Please do not request inspections under this permit until 2 business days after permit issuance.NEW SERVICE 200AMP, 60 LIGHTS, 80 RECEPTACLES, 8 SMOKE DETECTORS, 1 GARBAGE DISPOSAL, 1 RANGE, 1 DISHWASHER, 1 WASHER, 1 DRYER, 1 FURNACE, 1 A/C, 1 WATER HEATER.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 28kW Generator w/ (2) 200A Transfer Switches
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Electrical Permit associated with Fire Permit 1174568.
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up was completed and inspected in 2018 under permit # 849491 Pepco never tied in service
Please do not request inspections under this permit until 2 business days after permit issuance.Install new circuits for 5kw AHU(aux heat) and 30amp compressor. Geothermal water furnace installation.
Please do not request inspections under this permit until 2 business days after permit issuance.1X NEW 200A SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical service upgrade from 100-200amps
Please do not request inspections under this permit until 2 business days after permit issuance.Replace 1 defective Solar Inverter and 1 Module.