Search Permits
243,291 results
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
EXISTING 2 FAMILY HOUSE WITH MECHANICAL WORK AT CELLAR,1ST,2ND AND 3RD FLOOR.JOB FILED TO RELATED TO ALT2 APPLICATION #B01452927-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Partial demolition interior components only and no mechcanical demolition equipment other than handheld devices is used
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, AND CEILINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SUBSEQUENT PLUMBING FILING FOR INSTALLATION OF (2) BATHROOMS, (1) KITCHEN AND RELOCATION OF (5) SPRINKLER HEADS. NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY.
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH, 10TH AND 11TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Create openings in exterior wall for installation of sleeves for PTAC units. No change in use, occupancy or egress under this application.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Filing for fence application, installation of 8'-0 plywood construction fence in conjunction to application B01273633-I1.
Modification to existing HVAC system as per plans filed herewith.
SUBSEQUENT FILING PLUMBING WORK UNDER DOB APPLICATION# M01370350-I1 FOR CELLAR AND FIRST FLOOR RESTAURANT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Interior renovation for Cellar, 1st Floor and Mezzanine New Eating and Drinking Establishment. Install new kitchen w/ dumb waiter shaft, new stairway down to cellar, new exhaust hood with duct from 1st Fl to Bulkhead Roof. Extend ex. Mez w/ reloc. stairwa
Renovate existing store for retail store. U.G.#6, TAKE OVER OLD JOB 301417072 AND ADDRESS VIOLATION # 039189505k. No change in egress, occupancy or use is involved under this application.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy
Installation of solar panels, rooftop, grid tied, railed, 21 modules, 8.61 KW
Plumbing modifications to the cellar, mezzanine and floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.46 KW
General construction associated with lobby renovation on 1st floor as per plans filed herewith. No changes in use, egress or occupancy.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED TO INSTALL KITCHEN EXHAUST SYSTEM (MAKE-UP AIR, AND EXHAUST FAN) AND CONDENSING UNITS (HVAC) EXISTING COMMERCIAL SPACE AT FIRST FLOOR AS PER PLANS. FIRESUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TOUSE, EGRES
Direct replacement of existing HVAC systems in 2nd & 6th floor mechanical rooms, new fresh air louver venting at windows on 2nd and 6th floors. New ductwork at mechanical rooms.
Repair and replace gas piping/ riser from Cellar to 1st floor roof.
Legalization of 1st floor bathroom fixtures for unit 1A. No change of use, egress or occupancy under this application.
To address DOB emergency work order per Control# 365315, Repair & replace dislodged brick, cracked parapet, & damaged coping at roof; repoint step cracks/joints on Exp 1, 2, 3; repair defective window lintels, sills, & spandrel. Repair building facade
MODIFICATION OF SPRINKLER HEADS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical work as per plans in existing space. no change in use egress or occupancy
INSTALL, REPLACE AND RELOCATE PLUMBING FIXTURES, INCLUDING SHOWER AND SINK, WITH ASSOCIATED WATER SUPPLY AT MENS RESTROOM AND STAFF BREAK ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.