Search Permits
243,291 results
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
CONSTRUCTION OF TEMPORARY CONTRACTOR'S SHED (SHANTY) AS PER DRAWINGS AND BC 3303.16 DURING UNDER CONSTRUCTION NB
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION AND USE OF TEMPORARY TITAN LOADING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF STAIR TOWER SCAFFOLDING AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
NEW INSTALLATION OF 12' CURB CUT
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of new VAV air handling unit and associated distruction to the south portion of the floor. Minor modification to the existing distrubution serving north portion of the floor. Installation of new electric baseboard for preimeter heating.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
FILING HEREWITH UNDERGROUND PLUMBING AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
EXTERIOR RENOVATION OF AN EXISTING 3-STY RESIDENTIAL HOME WITH THE REPLACEMENT OF THE EXISTING EXTERIOR WALL WITH A NEW THIN BRICK VENEER WALL, NEW FENCE ON THE 2ND, 3RD FLOOR REAR, AND ROOF. AS WELL AS THE INSTALLATION OF METAL BALCONY DECKS.
Alt. ST filed subsequently with the alt. GC application.
NEW INSTALLATION OF 12' CURB CUT
Mechanical modifications on 18th floor as per plans filed herewith. No changes in use, egress or occupancy.
FACADE REPAIRS, SCAFFOLD INSPECTIONS, THREE MEN LETTER
Temporary Installations to be used on a temporary event NYC WFF 2026 Grand Tasting. All the Installations are to be removed upon completion of the event.
Fire Repair of 1st and 2nd floor in rear
REMOVE EXISTING SHED AT LEFT SIDE OF REAR YARD TO ADDRESS DOB COMPLAINT #3A74425. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
1ST FLOOR EXISTING RETAIL SPACE INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filing for addition of duct transfers and re-balancing of existing diffusers, VAV boxes, and AC units. No change in use, egress, or occupancy filed herewith.