Search Permits
240,837 results
Please do not request inspections under this permit until 2 business days after permit issuance.Installing 14 new roof-mounted solar panels at 5.74kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.Install (358) low voltage devices.
Please do not request inspections under this permit until 2 business days after permit issuance.replacing panel
Please do not request inspections under this permit until 2 business days after permit issuance.adding outdoor inlet and interlock inside panel for a portable generator hook up
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ INSTALL 17 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 7.48KW
Please do not request inspections under this permit until 2 business days after permit issuance.Installing 47 new roof-mounted solar panels at 21.15kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.Run new 20A 120V dedicated wire, install 20A GFCI outlet, install 20A AFCI switch, and replace 15/20 tandem with a 20/20 tandem breaker.
Please do not request inspections under this permit until 2 business days after permit issuance.COMPLETE NEW FIRE ALARM SYSTEM. LV COMPANION PERMIT
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage for voice/data
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ INSTALL 35 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 15.4KW
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/INSTALL (22) ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 9.68KW
Please do not request inspections under this permit until 2 business days after permit issuance.level 2 EV charging circuit
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage for voice/data
Please do not request inspections under this permit until 2 business days after permit issuance.This EP is only for Kitchen Renovation (lights/Plugs AND (5- Dedicated Circuits- 120v 15/20 amps.) and Basement wiring only.
Please do not request inspections under this permit until 2 business days after permit issuance.Meter Enclosure
Please do not request inspections under this permit until 2 business days after permit issuance.ADD ON THE DECK: # (1) RECEPTACLE
upper level next to five below
Please do not request inspections under this permit until 2 business days after permit issuance.Replace service entry cable
Please do not request inspections under this permit until 2 business days after permit issuance.Interior alterations 309 sq ft
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen Remodel
Please do not request inspections under this permit until 2 business days after permit issuance.Install (2) new Light poles with concrete bases, Each pole to have (2) led pole heads
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL ACCESS CONTROL SUITE 1100 MAIN ENTRY DOOR
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of an 50amp EV receptacle (NEMA 14-50R).
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen renovation, relocate existing circuits for range, dishwasher, microwave, fridge, kitchen receptacles. Install new circuit for caffe machine, island receptacles, mini bar fridge, lights.
Please do not request inspections under this permit until 2 business days after permit issuance.New Construction - Single Family Home - 400 Amp Service, Lights, Switches, Receptacles, Generator
Please do not request inspections under this permit until 2 business days after permit issuance.ADD 8 RECESSED LIGHTS, REPLACE 8 RECESSED LIGHTS, REPLACE RING MOTION/CAMERA LIGHT, REPLACE 6 SMOKE DETECTORS, ADD A CAR CHARGER PLUG
Please do not request inspections under this permit until 2 business days after permit issuance.Wire and install some recessed lights, some fixtures , switches, outlets and power and connection for kitchen appliances.
Revision - We would like to add a Water Heater Circuit Install and a Range Circuit Install to the permitPlease do not request inspections under this permit until 2 business days after permit issuance.Air Handler Circuit Install
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL 9- LIGHTS, 29 - OUTLETS USING EXISTING CIRCUITS
Please do not request inspections under this permit until 2 business days after permit issuance.240v Dedicated Circuit for EV Charger