Search Permits
12,747 results · type: mechanical
Replacing the condenser, gas furnace and evap coil
Replacing 2 condensers and 2 air handlers
2 ton heat pump replacement
2 ton electric system replacement
3 ton gas system
3 ton gas system replacement
2.5 ton gas system
meter out over 6 months and water heater
meter out over 6 months and install water heater
Delta gas leak
New Construction with three fixtures: one (1) stove, one (1) water heater, one (1) HVAC unit
New Construction with three fixtures: one (1) stove, one (1) water heater, one (1) HVAC unit
gas leak
Electric water heater installed
Replace existing 3.5 ton condenser and evaporator coil
Replace existing 5 ton condenser, furnace and evap coil
Electric water heater installed
Provide 6 month vacancy gas inspection.
Six months vacancy gas test,, install tankless water heater
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
Install HVAC System 1- 2 ton system, and 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out phase includes connecting the HVAC units, Installing trim, installing thermostats, and testing the system for proper operation and efficiency.
Install HVAC System 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out phase includes connecting the HVAC units, Installing trim, installing thermostats, and testing the system for proper operation and efficiency.
To install a 3 ton electric system. AIR HADLER, HEAT KIT, AND CONDENSER
Install a three ton electric system. Air handler, heat kit and condenser