Search Permits
240,145 results
roof replacement over dining room, remove 2 skylights, add 1 skylight, replace ceiling light fixtures penetrating roof, replace hvac rooftop with new in same location.
revision to pa 202607014408 from proposed a-2 to b occupancy to change occupancy load
revision to pa # 202606304269: revise foundation detail and add shear to (n) wall
asbestos removal per s.04 for demo permit 202603187847 per report number kcm2031-acumen.
revision to 202208251288: specify location of 3' x 3' catch basin in garage & sink in rear family room on level 1
l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing
unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes.
1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight.
as built pa# 202502120163. per inspector request: 1) change ansul module description 2) add horn strobe on roof 3) add inspector test valve to drawing. building permit 202401083567
to comply with nov#202660685: repair damaged sheetrock with 5/8in type x gyp board. fire damage repair. work in lobby area and opposite side of wall.
revision to 202305157787; remodel existing kitchen and a bathroom and remove one fire place at second flr. correct existing 1st flr layout (bedroom and studio).
revise pa#2025-1029-8348 to document actual field conditions, no material changes to project or construction scope.
revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)
partial conversion of existing ground floor storage/garage to conditioned space. horizontal addition into rear yard. horizontal addition on level 2 and level 3.
to obtain final inspection for work approved under pa# 2025-0623-9226. all work is complete
exploratory demo: will do exporatory demo on flrs 1-3 of home.
interior only base building work for prospection tenants. partiitions- partial hieghts for enclosed block of restrooms. wet bar/kitchenette. electrical lighting and distribution. future tenant under separate ti permit
enclose lightwell with roof approximate area 60 sq ft. install 2 skylights in new roof.
1st & 2nd: install traffic-calming speed bumps within the existing pakring garage. no structural modifications. within gthe bldg.
kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixtures
massage parlor tenant improvement
replace bathtub tile, bath vanity, vanity light, kitchen counter tops. all in kind, like for like. install 2 new electrical boxes for pendent lights at kitchen sink area. compliance w/ chapter 1134a
to obtain final inspection for work approved under pa# 202404301079. all work is complete.
recommencement and completion of work approved under pa# 202503212787, 202507281718.
rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath.
repair old rear deck rotten wood - like for like, less than 50% deck is in rear, non street facing.
replacement of 3 bard units, 2 serving the swgr building and 1 serving the battery building and structural support to support the units. no new fire smoke dampers required.
rev 202604209741: structural replace rear foundation approx 23lf in-kind.
to comply with complaint 202660627: remodel full bathroom ground floor, 2 rooms ground floor, replace 2 windows and 1 sliding door, existing opening, back of home, non street facing. replace gypsum board finishes on ceiling and wall cabinets in bathroom area. replace new tub like for like in bath.
common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location.