Search Permits
240,145 results
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING � CABLE AND DATA
mechanical
mechanical
plumbing
electrical
plumbing
mechanical
plumbing
mechanical
plumbing
electrical
plumbing
electrical
INSTALLATION OF SINGLE PERSONNEL HOIST (PM1) IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
test
PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AND SUPPORTED SCAFFOLD AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
FISP INSPECTION VIA INDUSTRIAL ROPE ACCESS
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
related Mechanical work for INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT in partial 1st floor and cellar. replace existing (5) equipment, add 2 heat pump systems, etc.
APPLICATION IS FILED FOR THE CONSTRUCTION OF AN ATTACHED 2-FAMILY, 3-STORY RESIDENTIAL BUILDING WITH ONE-CAR GARAGE ON ZONING LOT WHICH CONSISTS OF (4) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING NewGen PAIN MEDICINE.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filing to install the Deli kitchen hood and ductwork as per plans.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.