Search Permits
247,466 results
Replacement of complete existing central heat and air system with or without duct work Replace existing outdoor condenser and ceiling fan coil with new matching equipment
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3bath] with Covered Porch and Covered Patio. Bldg 2
Installing a new irrigation system
New 1-story single family dwelling with 4 bedrooms and 3.5 baths 3 car garage rear patio and front porch.
Construct new driveway approach of 17 FT and sidewalk of 23 LF.
Unit 2102 New construction of 3 story townhome 2Plex with 4 beds 3.5 baths
Eliminating and capping existing water and drain stub outs at 5 sink locations 1 washer box and 2 floor drains.
Demolition of an approximately 3000 sq. ft. portable building for Bethany United Methodist Church of Austin. 2026 105306 DA - Approved
Replacement of complete existing central heat and air system with or without duct work hvac replacement
Installing a new irrigation system
Building 2 2 Story SFR rear of main house with alley access - ADU / Garage
Repair and replace gas yard line and test
New inground pool (810 sq ft) w/ spa. (45.5 sq ft) and concrete decking
ETJ tenant Finish out
Trulieve
Replacement of complete existing central heat and air system with or without duct work
New construction of 2 story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Replacement of an existing water heater
PALMS - AUS-008 (Congress & 7th) IKE Smart City Kiosk
ETJ New Construction of a SFR 2302sqft Meter Installation
Electrical connection from house to new backyard shed as an office space via sub panel. The office will consist of electrical outlets and lights.Shed is 192 square feet.
ePlan: Residential Expedited Review - (Three Unit) Bldg 1 New Construction of 2-Story SF Res [3bed 2.5bath] with attached carport
We will have three access holes and excavate 85 of tunnel with repairs/replacement of pipe and fittings to 5 fixtures in the home.
Full kitchen remodel with layout changes; primary bathroom full remodel with slab cuts at relocated fixtures; flooring removed and replaced on both floors; new trim paint interior doors and lighting throughout. Addition: new 91 SF pantry/mudroom off the rear of the third garage bay new foundation/slab exterior walls and roof tied into the existing structure. covered patio roof extension (5.22 ft 28.5 ft) with a long-span LVL beam (28.5 LF) replacing an existing load-bearing limestone column p
adding a solar pv rooftop system to an existing residence
Replacement of complete existing central heat and air system with or without duct work
Installing a new irrigation system
ETJ New Construction of a SFR 2625sqft Meter Installation
Express: Foundation repair - Installing 15 steel hybrid piers
Change of Use from Office/Warehouse to Personal Improvement Services; no remodel no construction planned.