Search Permits
12,747 results · type: mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
New Construction
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
New Construction
mechanical_permit_(c)
mechanical_permit_(r)
Floor 5 of this 8-story building Scope includes Underfloor interior zones that are served by dual‑path AHU‑5.1 and AHU‑5.2, with the Telecom space served by FCU‑5.1 (CHW). Scope includes installation of both AHUs and FCU, associated routing and controls, and electric duct heaters—AHU‑5.1 (13 kW, 11 kW, 10 kW) and AHU‑5.2 (11 kW, 9 kW, 10 kW). Include Floors 6,7,8 HVAC on this permit
Install new lennox 3 ton gas furnace, box coil, and condenser for downstairs with all new R-8 flexible ductwork Install new lennox 3.5 ton air handler and condenser with all new R-8 flexible ductwork upstairs Run HVL and hood vent ducts out
Gas vacancy inspection
Gas vacancy inspection
Installation of a new air handler and condenser.
install 5 ton gas complete HVAC system
Only electric water heater
Only electric water heater
Only electric water heater
Only Electric water heater