Search Permits
239,304 results
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing 14-50 receptacle with hardwired EV charger.
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.New home 120/240 V. 200 AMP, one sud panel 100 AMP, wiring lights receptacles appliances
Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP FOR DWELLING (200 AMP) NEW GROUNDING, WIRE 18 CIRCUITS , ALL NEW RECEPTACLES AND ALL NEW LIGHTING AS PER CODE. WIRE KITCHEN, BATHROOMS,FAMILY ROOM BEDROOMS.
Please do not request inspections under this permit until 2 business days after permit issuance.Remodel work.
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp heavy-up underground fed. Please text/call before arriving so I can meet you. Christa Tichy 301-310-8081
Please do not request inspections under this permit until 2 business days after permit issuance.replace existing panel with new 200 amp panel and replace service cable also which existing 200 amps
Please do not request inspections under this permit until 2 business days after permit issuance.Replace meter and service cable from meter to service head
Please do not request inspections under this permit until 2 business days after permit issuance.Replace meter and service cable from meter to service head
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and relocate existing wires in the area designated. Run new wiring on the new wall and ceiling for receptacles, switches, and light fixtures. Run new circuit for the new sump pump.
Grading and restriping of existing parking lot (Chase Bank) per plan.
Interior alterations to existing one family dwelling subject to field inspection (STFI).
in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s).
Revision - Service upgrade from 100 amp to 200 ampPlease do not request inspections under this permit until 2 business days after permit issuance.Replace existing 100 amp service panel with new 100 amp service panel and 100 amp disconnect. Replace line and load side service cables
Please do not request inspections under this permit until 2 business days after permit issuance.Install one 48-amp car charger in garage with load control near panel
Please do not request inspections under this permit until 2 business days after permit issuance.Install one 48-amp car charger
Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP 200 AMPS.
Please do not request inspections under this permit until 2 business days after permit issuance.Install car charger near driveway.
Construct tenant improvement to existing restaurant space subject to field inspection STFI.
Allow housing for new detached dwelling unit per land use code. Existing detached dwelling to remain. Construct new one-family dwelling per plan.
Replacing 70 ft of gas line from meter to 40,000 BTU water heater at existing SFR with Schedule 40 Metallic pipe. Minimum required building inspections: Gas underground, gas rough in and gas pipe final.
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
City of Mesa Project - Install one set of neon letters MAIN STREET MARKET installed directly onto building facade with painted background lettering 39 sq. ft. and one set of non-illuminated 1/2 inch thick flat-cut-out letters BY LOCAL FIRST AZ with 1.5 inch aluminum angle mount, mechanically fastened to top of existing canopy. 6 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
New dedicated 20-amp circuit for GFCI. Electrical inspection required.
Building 9: 3-story, type V-A construction, 77,927 SF, group R-2 occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit
Please do not request inspections under this permit until 2 business days after permit issuance.Audio Video system consisting of Speakers, (2) Cameras, (2) Displays, (1) Touch Panel
Please do not request inspections under this permit until 2 business days after permit issuance.13 roof mounted solar panels
Please do not request inspections under this permit until 2 business days after permit issuance.34 roof mounted solar panels