PermitDig

Search Permits

235,634 results

plumbing

2322 NEVADA AVENUE, Norfolk
0KOct 8

fire_protection

5900 E VIRGINIA BEACH BOULEVARD, Norfolk
0KOct 8

RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES ON 1ST AND 2ND FLOOR; REPLACE SUMMER KITCHEN, INSTALL NEW 2-PC RESTROOM, BOILERS AND HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPA

58-44 136 STREET, Queens
60KOct 8

abc

1 INVALID LANE, Manhattan
10KOct 8

SUBSEQUENT SPRINKLER AND STANDPIPE APPLICATION FILED HEREWITH.

410 40 STREET, Brooklyn
Oct 8

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

241 CONSELYEA STREET, Brooklyn
Oct 8

INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

227 BOWERY, Manhattan
1KOct 8

ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING POPMART

680 5 AVENUE, Manhattan
2KOct 8

INSTALLATION OF TEMPORARY MOCKUP SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

280 BROADWAY, Manhattan
10KOct 8

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

325 WEST 12 STREET, Manhattan
1KOct 8

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

213 EAST 83 STREET, Manhattan
4KOct 8

Suspended Scaffold Installation for Facade Restoration and Inspection

639 GRAND STREET, Brooklyn
Oct 8

Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting documents.

861 SOUTHERN BOULEVARD, Bronx
10KOct 8

PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING Logo CARROT.

2161 BROADWAY, Manhattan
1KOct 8

Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

410 CENTRAL PARK WEST, Manhattan
3KOct 8

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

51 WEST 119 STREET, Manhattan
18KOct 8

PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION

806 LAFAYETTE AVENUE, Brooklyn
5KOct 8

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2245 OCEAN PARKWAY, Brooklyn
10KOct 8

LEGALIZE EXISTING NON-ILLUMINATED, NON-ADVERTISING ACCESSORY MONUMENT SIGN ON 2ND AVENUE FRONTAGE. NO NEW WORK. FILED TO ADDRESS OATH/ECB VIOLATION 35434300H (DISMISSED). WWP CIVIL PENALTY PAID, BIS INVOICE 13828344

1261 2 AVENUE, Manhattan
6KOct 8

INSTALLATION OF PLYWOOD CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

180 WEST STREET, Brooklyn
1KOct 8

Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

325 WEST 19 STREET, Manhattan
3KOct 8

EQUIPMENT USE: INSTALLATION OF A PERSONNEL HOIST (Car#1) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OF OCCUPANCY UNDER THIS APPLICATION. HOIST TO COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.

38-02 126 LANE, Queens
10KOct 8

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

623 5 AVENUE, Manhattan
1KOct 8

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

88 VISITATION PLACE, Brooklyn
3KOct 8

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

125 BRIGHTON BEACH AVENUE, Brooklyn
9KOct 8

INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

308 EAST 162 STREET, Bronx
11KOct 8

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

395 SOUTH 2 STREET, Brooklyn
1KOct 8

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

118-40 MERRICK BOULEVARD, Queens
0KOct 8

EQUIPMENT USE: INSTALLATION OF A PERSONNEL HOIST (Car#2) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OF OCCUPANCY UNDER THIS APPLICATION. HOIST TO COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.

38-02 126 LANE, Queens
10KOct 8

Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans

335 EAST 51 STREET, Manhattan
Oct 8