Search Permits
234,400 results
DIRECT REPLACEMENT OF ROOFTOP HVAC UNITS. REPLACEMENT UNITS TO BE PLACED ON EXISTING DUNNAGE. THERE IS NO OTHER WORK PROPOSED. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSE REMOVAL OF INTERIOR FINISHES & PARTITION WORKS AS PER PLAN OF EXISTING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
inspection using industrial rope access techniques and methods. See attached plans; designated primary site supervisor: GABRIEL HURTADO
DIRECT REPLACEMENT OF ROOFTOP HVAC UNITS. REPLACEMENT UNITS TO BE PLACED ON EXISTING DUNNAGE. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL EXTERIOR ILLUMINATED WALL SIGN (INTERVENTIONAL)
Installation of suspended scaffold for facade work or inspection
INSTALLATION OF A COMMERCIAL KITCHEN HOOD ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
INTERIOR RENOVATION OF EXISTING APARTMENT. REMOVE AND INSTALL NON-STRUCTURAL PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior renovation to existing apartment #4. No change to use, egress, or occupancy.
Installation of solar panels, rootop, grid tied, railed, 27 modules, 11.07 KW
INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS.
PLUMBING WORK ONLY BEING FILED IN CONJUNCTION WITH ALTERATION DOBNOW #B01355071-I1. NEWPLUMBING PIPING AND FIXTURES PER PLANS. INSTALL NEW NAVIEN HWH AND NAVIEN TANKLESS BOILER.
MINOR INTERIOR RENOVATION IN APT #4F ON THE 4TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS OF THE BUILDING.
Renovate existing commercial store on 1st floor for eating & drinking establishment. Install minor partitions, finishes, flooring ceiling and plumbing fixtures. Modify existing kitchen equip, exhaust and HVAC system. No change in use, egress or occupancy.
Underpinning design
INTERIOR RENOVATION IN 18E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALL NEW CHIMNEY LINERS AND DRAFT INDUCERS. REPAIR EXISTING FIREPLACES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Alt 2.Structural work for wood framing at roof.. Maintain structural stability during partial demolition of 2nd and 3rd Floor. New removeable Trex Deck wood support.
PROPOSED TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE A FUTURE CONSTRUCTION SITE, IN CONJUNCTION WITH ALT#Q01461996-I1.
NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL2) - MECHANICAL FILING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW BUILDINGS B00848051, B00848002, B00847849
ASSOCIATED PLUMBING AND DRAINAGE FOR PROPOSED 2 FAMILY DWELLING
INSTALLATION OF NEW NON-LOAD-BEARING WALLS, DOORS, WALL AND FLOOR FINISHES, CEILINGS, AND MILLWORK ON THE 25TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION, NEW MEZZANINE AND HVAC IN THE 1 STORY BUILDING. DEMOLITION WORK, CONSTRUCTION AND MECHANICAL WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
NEW PLUMBING FIXTURES & DRAINAGE IN CONJUNCTION WITH NB APPLICATION FOR A NEW 2 FAMILY DWELLING
Respectfully submitting foundation drawings for rear extension for review.
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 15 MODULES, 6.6KW
UPGRADE EXISTING COMMERCIAL KITCHEN TYPE I EXHAUST SYSTEM, INCLUDING MODIFICATIONS TO THE GREASE DUCT, EXHAUST FAN, AND ASSOCIATED MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of damaged flooring, painting, sheetrock, insulation and plumbing fixtures connected to existing rough plumbing be filed under a separate PL application. No change of use, egress or occupancy.
REGISTER EXISTING BOILER AND OIL BURNER.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.