PermitDig

Search Permits

234,400 results

Temporary construction fence in conjunction with DOB NOW JOB # B01446873-I1

1652 EAST 5 STREET, Brooklyn
0KOct 7

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

528 WEST 145 STREET, Manhattan
9KOct 7

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

1350 COLLEGE AVENUE, Bronx
32KOct 7

Replacement of hot water radiator. Installation of new fan coil unit in the Stolz Lounge and connection to existing chilled and hot water piping from the Jacob Reingold Pavilion.

5903 PALISADE AVENUE, Bronx
10KOct 7

PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR EXISTING BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

145 CENTRAL AVENUE, Brooklyn
4KOct 7

TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

16 CONVENT AVENUE, Manhattan
5KOct 7

INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS

20 ANTHONY STREET, Brooklyn
5KOct 7

Installation Of one man bucket for facade repair.

279 EAST 4 STREET, Manhattan
Oct 7

INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS.SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE2022 NYCBUILDINGCODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION

739 MYRTLE AVENUE, Brooklyn
Oct 7

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

143-05 41 AVENUE, Queens
45KOct 7

Sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy.

1211 AVENUE OF THE AMERICAS, Manhattan
7KOct 7

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

1921 CORTELYOU ROAD, Brooklyn
Oct 7

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

11 EAST 1 STREET, Manhattan
Oct 7

Mechanical application filed herewith to install a generator on the roof. No change in use, egress or occupancy.

5361 PRESTON COURT, Brooklyn
65KOct 7

INSTALLATION NEW DUNNAGE, MECHANICAL SYSTEM REPLACEMENT ON ROOF AND MINOR DUCT WORK FOR EXISTING COMMERCIAL BUILDING. NO CHANGE IN USE, OCCUPANCY AND STRUCTURE UNDER THIS APPLICATION.

271-12 UNION TURNPIKE, Queens
20KOct 7

NEW TEMPORARY SIGNAGE (OCTOBER 6, 2026 -MARCH 1, 2027) FOR BUILDING. 42 SF ILLUMINATED AND NON-ILLUMINATED SIGNS.

216 LAFAYETTE STREET, Manhattan
14KOct 7

Installation of suspended scaffold for facade work or inspection.

300 WEST 20 STREET, Manhattan
Oct 7

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

23-11 33 STREET, Queens
9KOct 7

Alteration of existing plumbing fixtures and gas cooking equipment per plan for existing commercial space. No change in use, occupancy or egress.

2006 CHURCH AVENUE, Brooklyn
5KOct 7

SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM FACADE EXTERIOR WORK. FACADE INSPECTION TO BE PERFORMED. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION.

2385 BARKER AVENUE, Bronx
Oct 7

Install of temp tents, no alt to exist structures for Annual Staten Island Half Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion

1 EVENTS PLAZA, Staten Island
8KOct 7

Mechanical Modifications on 23rd and 24th Floor as indicated on plans filed herewith.

ONE BRYANT PARK, Manhattan
935KOct 7

INSTALL TEMPORARY 8' HIGH CONSTRUCTION FENCE

4241 PARK AVENUE, Bronx
5KOct 7

INSTALL TEMPORARY SUPPORTED SCAFFOLD FOR EXTERIOR FACADE WORK AS PER PLANS

245 EAST 19 STREET, Manhattan
300KOct 7

Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use or egress.

1200 VAN NEST AVENUE, Bronx
10KOct 7

ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - (LOGO CUBE) SECURE SELF STORAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.

6120 15 AVENUE, Brooklyn
11KOct 7

SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM FACADE EXTERIOR WORK. FACADE INSPECTION TO BE PERFORMED. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION.

789 WARING AVENUE, Bronx
Oct 7

INTERIOR RENOVATION OF AN EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.

150-18 8 AVENUE, Queens
138KOct 7

ALTERATION-2 APPLICATION FILE FOR INTERIOR RENOVATION INCLUDING REPAIR THE EXISTING DAMAGE JOIST AND PARTITION FOR FIRE DEPT ACCESS TO THE ADJACENT PROPERTY, NO CHANGE IN USE, EGRESS AND OCCUPANCY.

2249 BASSFORD AVENUE, Bronx
300KOct 7

Interior renovation of the existing 1-family dwelling as per the submitted drawings. No change in use, egress and occupancy.

135-16 96 STREET, Queens
464KOct 7