Search Permits
12,747 results · type: mechanical
Gas Vacancy Inspection
Replace existing 3 ton Condenser, Furnace and Evap Coil
Replacing approximately 120 feet of gas line. Gas meter has been pulled. After work is performed a pressure test must be done before inspection. Then we will have to meet up with the inspector while the gauge is pressurized.
Electric water heater installed
Electric water heater installed
Electric water heater installed
Electric water heater installed
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
Addition and/or Alterations
New Construction
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations