Search Permits
230,168 results
PLUMBING PERMIT TO REPLACE TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES. USING GLASS DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
adding battery to existing system
CONSTRUCT A 457 SF SWIMMING POOL. NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST19-00383. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
30x30 900 sq. ft. Detached Shop/Barn with Attic Storage. Also, electrical service panel to be upgraded to 400A as part of project.
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing the existing electrical service with a 200 amp upgrade electrical service.
Please do not request inspections under this permit until 2 business days after permit issuance.Reinstall existing (59) panel roof mounted 15.34 KW PV solar in kind. No structural changes to occur.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL OF ROOF MOUNTED SOLAR PANELS (11.04KW); 24 REC460AA PURE-RX 460W PANELS
Please do not request inspections under this permit until 2 business days after permit issuance.ERECTED TEMPORARY POWER POLE FOR PEPCO TO RELOCATE THE SERVICE DROP SO THAT THE BRICK ON THE CHIMNEY CAN BE REPOINTED
Please do not request inspections under this permit until 2 business days after permit issuance.Installing a 10kw generator with a 100amp select circuit ATS.
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/INSTALL 42 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 18.48KW
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ INSTALL 19 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 8.36KW
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of two 10 ton AC Gas rooftop packaged units
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 28kW generator with 200 amp transfer switch
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Revision - There is a second electrical sign being installed at this location.Please do not request inspections under this permit until 2 business days after permit issuance.Wire channel letter sign and push through sign to existing circuit
Please do not request inspections under this permit until 2 business days after permit issuance.240v Dedicated Circuit for EV Charger
Please do not request inspections under this permit until 2 business days after permit issuance.Will be adding a Exterior service disconnect next to meter.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation add on of two touchscreen touchpads.
Please do not request inspections under this permit until 2 business days after permit issuance.200 Amps Main Electrical Panel Replacement
Please do not request inspections under this permit until 2 business days after permit issuance.Replace 200 amps panel, install 12 lights, 30 switches/outlets 6 circuits and mini split system
Please do not request inspections under this permit until 2 business days after permit issuance.Typical temp pole service for construction
Please do not request inspections under this permit until 2 business days after permit issuance.Pole Service
Please do not request inspections under this permit until 2 business days after permit issuance.To roughing 10 outlets
Please do not request inspections under this permit until 2 business days after permit issuance.Additional work per owner's request
Please do not request inspections under this permit until 2 business days after permit issuance.Level 2 EV charger installation inside the garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Panel Replacement at Apartment #608