Search Permits
230,168 results
minor structure framing for mechanical units. add t24 electrical for pa#: 202606082725.
recommencement and completion of work approved under pa# 2023-1107-0299
to comply with physical inspection report cc-8748
we will re-surface a portion(~10' x 13') of a rear(not street facing)wall, apply wareproofing and stucco coats to match the existing texture.
top fl: remodel kitchen: remove 2 bisecting nonload bearing walls new appliances, fill 2 windows, install 1 new window, replace new skylight @ living room, new cabinets, new on demand 8 relocate water heater, sister new 2x6 to (e) 2x4 cicling joist @ kitchen, move (e) kitchen sink over 18" , 6 new..
interior remodel of unit #203 existing bath and add new bath. remodel foyer and entry. non-structurl work only. no exterior work
revision 3 to pa 202510298348: outside protal material cladding change new framing added at the exterior in order to support sheet metal. existing to be removed
levels: g 1-2, 5, 8-10,12-16, 21-22. 54 evacuation signs.
bathroom remodel from tub into a shower. permits for plumbing and electrical to be pull by subs.
dry rot repair to existing backyard deck @ rear. less than 50% replacement
drywall repair in kitchen approx 2 square feet.
suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812
remove metal siding that was placed where original windows were located and removed on the east elevation. place new window within existing openings. add glass doors to replace existing roll up door.
add one powder room at 2nd fl. in kind remodel of existing bathroom and kitchen at 2nd fl.
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.
change rear stair platform & stair to yard to concrete (previously wood). update internal stair configuration from 2nd to 3rd floor; add (1) entry step for code compliance. add stop @ ground floor. minor framing updates
solar permit: installing 14 solar pv modules, 420 watts per module, total no. of rating 5.88 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 5.88kw pv array ( 14 p
repair the dryrot and stucco in the front stair wall facing the street, all materials in kind.
revision to pa #202605010494. shoring of (e) structure and on site shoring. revise structural details to original submitted details
remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall
revision to pa# 202401083567. technical infeasibility for garage entrance. new signage.
floor 1- partially demo (e) concrete slab and lower to achieve 7'-6" clear head height. construct rear yard addition to accomodate (n) kitchen and dining room. construct (n) interior staircase to floor 2. remodel interior to accomodate (n) bathroom, family room, mechanical room, and storage. floor 2
level 1 interior remodel extend back to align with 2nd level and add 2 bedrooms and 1 bath. add a 6' wide deck on the 2nd level.
unknown
unknown
UNAUTHORIZED CONSTRUCTION COB25-00218. Covered patio on the rear and side of home.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (1) BACK-UP BATTERY, 15 KWH TO EXISTING SOLAR (16.470 KW)
Please do not request inspections under this permit until 2 business days after permit issuance.ONE GATEWAY INSTALLED BETWEEN METER AND MSP. (200A SERVICE)
Please do not request inspections under this permit until 2 business days after permit issuance.(1) dedicated circuit for a 5 TON 60A 240V Air Handler (1) dedicated circuit for a 2 TON 30A 240V A/C condenser
Please do not request inspections under this permit until 2 business days after permit issuance.Install energy storage system