PermitDig

Search Permits

230,168 results

Minor partition work in apts 26a, 27a & 27b on with general carpentry. No change to use bulk or egress

18 GAY STREET, Manhattan
153KOct 5

LEGALIZE 3 FIXTURES BATHROOM IN CELLAR; REMOVE EXISTING GAS BOILER AND HWH AND INSTALL NEW COMBI BOILER; ADD A WASHING MACHINE AND GAS DRYER.

2105 SEWARD AVENUE, Bronx
Oct 5

RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

190 TERRACE PLACE, Brooklyn
150KOct 5

INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

41-08 PARSONS BOULEVARD, Queens
32KOct 5

Modification to plumbing fixtures as per plans filed herewith. No change in egress, use or occupancy.

260 MADISON AVENUE, Manhattan
15KOct 5

SUBSEQUENT FILING FOR PLUMBING WORK TYPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

538 BEACH 68 STREET, Queens
15KOct 5

PLUMBING SCOPE OF WORK INCLUDES A NEW DOMESTIC WATER SERVICE, NEW HOT WATER HEATER, HOT WATER RECIRCULATION SYSTEM, NEW PIPING AND PLUMBING FIXTURES, CONNECTION TO EXISTING SEWER AT POINT OF EXIT.

747 WASHINGTON STREET, Manhattan
Oct 5

General Construction, Structural & foundation work to create opening to courtyard at exterior wall at cellar indicated on drawings filed herewith No change in Use Egress or Occupancy under this application

1311 THIRD AVENUE, Manhattan
36KOct 5

APPLICATION FILED HEREWITH FOR FACADE REPLACEMENT ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

156 ROOSEVELT AVENUE, Staten Island
10KOct 5

General Construction, Foundation and Structural work to create opening to courtyard in exterior wall at cellar indicated on drawings filed herewith No change in use egress or occupancy under this application

1313 THIRD AVENUE, Manhattan
46KOct 5

RENOVATION OF EXISTING OFFICE SPACE ON PORTION OF 15th FL (marketed as 16) AS PER PLAN FILED NO CHANGE IN USE OCCUPANCY OR EGRESS

42 BROADWAY, Manhattan
175KOct 5

ABANDON FUEL OIL TANK IN YARD

2050 DAVIDSON AVENUE, Bronx
20KOct 5

RECONNECT GAS PIPING FOR DIRECT REPLACEMENT OF SEVEN (7) SPLIT HVAC SYSTEM FURNACES.

2250 ADAM CLAYTON POWELL BOULEVARD, Manhattan
25KOct 5

Modification to the existing HVAC system on the 17th floor (Pareto Investment) as per plans. No change to use, egress or occupancy.

499 PARK AVENUE, Manhattan
143KOct 5

PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01377903-I1

1601 ST JOHNS PLACE, Brooklyn
1KOct 5

PARKING GARAGE REPAIR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

7-11 SEAGIRT AVENUE, Queens
225KOct 5

SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.

657 DEKALB AVENUE, Brooklyn
116KOct 5

INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

134-03 59 AVENUE, Queens
36KOct 5

INTERIOR RENOVATION EXISTING 2 STORY BUILDING. WORK IN CELLAR, 1ST, 2ND FLOOR. CONSTRUCTION WORK AS PER PLAN. NEW/REPLACE METAL DECK, EXTERIOR STAIR, PARTITION, AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

2063 EAST 28 STREET, Brooklyn
49KOct 5

PLUMBING RENOVATIONS IN ALL UNITS AND PUBLIC SPACES ON THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE TO EXISTING USE, EGRESS, OR OCCUPANCY.

2550 WEBB AVENUE, Bronx
Oct 5

HEREWITH FILING TO INSTALL ACCESSORY STORAGE SHED IN COMPLIANCE WITH RCNY 101-14 AS PER PLANS.

86-26 235 COURT, Queens
5KOct 5

Interior alterations to apt#4H. No change of use, egress or occupancy under this application.

860 5 AVENUE, Manhattan
190KOct 5

Interior renovation of existing apartment 5A. Remove and install partition walls. Refinishing walls, floor and ceiling as per plans. No change in egress, occupancy or use is involved under this application.

565 WEST END AVENUE, Manhattan
115KOct 5

ALTERATION FILED FOR FACADE REPAIR AS PER PLAN. NO CHANGE IN USE OR OCCUPANCY.

312 EAST 106 STREET, Manhattan
91KOct 5

SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.

3776 LACONIA AVENUE, Bronx
14KOct 5

Propose construction fence around property line perimeter.

13-62 GIPSON STREET, Queens
20KOct 5

interior renovation and combination of apartments per TPPN 03/97. No change to use, egress, or occupancy

140 EAST 83 STREET, Manhattan
245KOct 5

INSTALL NEW PLUMBING FIXTURES, AND NEW COMMERCIAL COOKING EQUIPMENT AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

258 PROSPECT PARK WEST, Brooklyn
9KOct 5

LEGALIZE EXISTING SHOWER AND DRAIN INSTALLED UNDER 1994 APPLICATION 100869696 FOR APARTMENT 32-A. NO NEW PLUMBING WORK IS PROPOSED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

58 WEST 58 STREET, Manhattan
Oct 5

INSTALLATION OF NEW PIPE SCAFFOLD AT 141 EAST 25 STREET MANHATTAN NY 10010 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

141 EAST 25 STREET, Manhattan
10KOct 5