PermitDig

Search Permits

230,168 results

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

527 57 STREET, Brooklyn
3KOct 5

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2800 BRONX PARK EAST, Bronx
1KOct 5

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PLEASANT AVENUE, Manhattan
9KOct 5

FILING FOR TEMPORARY CONSTRUCTION FENCE

719 GRAND STREET, Brooklyn
5KOct 5

INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.

443 EAST 162 STREET, Bronx
Oct 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

2487 GRAND AVENUE, Bronx
1KOct 5

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

113 EAST 12 STREET, Manhattan
12KOct 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

8 BEACH STREET, Manhattan
1KOct 5

Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water source heat pump, piping, and accessories in accordance with the per plans.

1 PENN PLAZA, Manhattan
2.8MOct 5

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE

34-33 90 STREET, Queens
5KOct 5

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1692 WEEKS AVENUE, Bronx
4KOct 5

OUTRIGGERS SYSTEM INSTALLATION FOR FACADE INSPECTIONS, NO CHANGEIN USE, EGRESS, OR OCCUPANCY.

166-10 POWELLS COVE BOULEVARD, Queens
Oct 5

Installation of Outrigger platform for deck formwork as per plans filed herewith. No change in use, egress or occupancy.

45-11 23 STREET, Queens
Oct 5

INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

339 5 AVENUE, Manhattan
6KOct 5

INSTALLATION OF WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.

63 GOODWIN AVENUE, Staten Island
Oct 5

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.

309 AVENUE OF THE AMERICAS, Manhattan
Oct 5

Install illuminated non-advertising wall sign reading CVS pharmacy - facing West 70th Street

200 WEST END AVENUE, Manhattan
0KOct 5

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PLEASANT AVENUE, Manhattan
9KOct 5

ERECT HALO LIT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING BANK OF AMERICA WITH FLAG LOGO

589 BROADWAY, Manhattan
4KOct 5

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

69-01 35 AVENUE, Queens
9KOct 5

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR NEW BUILDING OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

846 58 STREET, Brooklyn
17KOct 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

8 GRAMERCY PARK SOUTH, Manhattan
5KOct 5

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

251 WEST 34 STREET, Manhattan
0KOct 5

HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATIONS, FILED UNDER SEPARATE APPLICATIONS . SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

245 PARK AVENUE, Manhattan
10KOct 5

Installation of temporary contractor field office and workers/ contractor sheds/ shanties at 1st & 2nd floor as per BC 3303.16 during construction of New Building filed under M01230881-I1 No change in use, egress and/or occupancy.

101 EAST 9 STREET, Manhattan
10KOct 5

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

123 EAST 79 STREET, Manhattan
9KOct 5

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

46-19 70 STREET, Queens
5KOct 5

INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

506 EAST 94 STREET, Brooklyn
6KOct 5

Alterations to mechanical system on 7th and 9th floor as per plans. No change to use, egress or occupancy.

437 FIFTH AVENUE, Manhattan
35KOct 5

proposed mechanical and electrical work for proposed eating and drinking establishment, accessory kitchen and mechanical equipment at 1st, cellar and mezzanine respectively

33 MAIDEN LANE, Manhattan
315KOct 5