PermitDig

Search Permits

229,427 results

Please do not request inspections under this permit until 2 business days after permit issuance.200A HUP

705 BONIFANT ST, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.

9920 KEY WEST AVE, Rockville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.

8005 GRAMERCY BLVD, Rockville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, and wired touchpad.

3 BUTTONWOOD LN, Bethesda
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.50amps EV car charger

108 SHERMAN AVE, Takoma Park
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and outdoor camera.

13305 WATERSIDE CIR, Germantown
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installing 200amp heavy up new 200amp meter socket,200amp panel ,200amp emergency disconnect and ground rods /cold water bond

19416 MUNCASTER RD, Rockville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.kitchen renovation 5 new 120VLcircuits 1 new 240VL circuit for a Range

13436 BURNT WOODS PL, Germantown
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a CCTV system with two hardwired cameras and 8 channel CSVR

7123 BETHESDA LN, Bethesda
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.58 roof mounted solar panels with Installation of 200A Backup Gateway for Energy Storage System, Service Conductor Refeed

15225 BRIARCLIFF MANOR WAY, Burtonsville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.SCOPE: INSTALLATION OF: #(8) APPLIANCES, #(20) LIGHTS, #(5) SWITCHES, #(20) OUTLETS, #(4) CIRCUITS, #(1) SMOKE DETECTOR AND #(1) HEAT PUMP.

5813 OGDEN CT, Bethesda
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Underground feed heavy up to 200 amps.

6518 DEMOCRACY BLVD, Bethesda
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.All wiring needed for elevator. Relocating or reworking of existing wiring needed to complete project.

12017 GREAT ELM DR, Potomac
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Furnish and install audio visual system to include: Audio speakers and control hardware, TV displays and control hardware

10100 NEW HAMPSHIRE AVE, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.

8224 LOCHINVER LN, Potomac
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION ON THE DECK OF: (1) CEILING FAN AND (1) OUTLETS

10934 BELLS RIDGE DR, Potomac
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up existing 100 amp service to 200 amp and upgrade existing household outlets.

1119 WOODSIDE PKWY, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (1) 50 AMP 240 V RESIDENTIAL EV CHARGING STATION

12007 CHESTNUT GLEN RD, Clarksburg
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and three outdoor cameras.

4123 WATERBUCK WAY, Burtonsville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of burglary system with hw devices, panel, touchpad, and outdoor cameras.

12109 CENTERHILL ST, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and one outdoor camera

9324 REACH RD, Potomac
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up to 200 amps, new electrical panel and outdoor disconnect with grounding system.

9621 TRAILRIDGE TER, Potomac
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Relocating main service panel, adding 125amp subpanel. Adding 200amp exterior disconnect.

6433 BROOKES LN, Bethesda
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.electrical to code for a media and yoga room.

11230 HUNTOVER DR, Rockville
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Two circuits, 8 lights, 2, up to 10 receptacles

14829 SILVERSTONE DR, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Installing EV charger level II in garage next to electrical panel. in a 50A double pole circuit breaker to a continuous output of 40A.

15231 FALCONBRIDGE TER, Gaithersburg
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Appliances 4 Rough Wiring Total lights, switches, etc. 40 1 to 20 lights, switches, etc. Additional (every 10 or fraction thereof) Lighting Fixtures 50

9304 COLESVILLE RD, Silver Spring
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.LIGHT, RECEPTACLE, SMOKE, DISHWASHER.

18508 FIDDLELEAF TER, Olney
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.Run dedicated 30A line for water heater

7109 CEDAR AVE, Takoma Park
Aug 31

Please do not request inspections under this permit until 2 business days after permit issuance.The replacement of a 30 amp circuit for an outdoor AC unit.

11912 HUNTERS LN, Rockville
Aug 31