Search Permits
229,427 results
to obtain final inspection for work approved under pa# 202503071824. all work is complete.
to obtain final inspection for work approved under pa# 202507019893. all work is complete.
new service, increase amp to 200. rewire all house, repair sheetrock, insulation, painting. all work is interior and electrical permit will be pulled seperately.
unit# ph2g: remodel of guest bathroom. demo tile, remove fixtures, locations to remain. replace with new. add recess lights. no structural work.
unit# 130a, 130c, 134a: remove (e) kitchen countertop and install new countertop in existing location, no change to kitchen layout, plumbing, electrical, counter replacement only.
remove rotten subfloor and sleepers over concrete and replace with gypcrete at first floor in one of the bedrooms.
unit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door.
modify (e) fire alarm system to install low frequency sounders in all sleeping areas to comply w/ sffc 2016 sec 1103.7.6.1.
solar permit: installing 16 solar pv modules, 420 watts per module, total no. of rating 6.72 kw. mounted: roof, ballasted: n, including 3 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | revision - e202606181613.
level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits
solar permit: installing 13 solar pv modules, 435 watts per module, total no. of rating 5.655 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 15 kwh each in capacity, ess units will not be closer than 3 feet | rooftop pv and bess in backyard
unit #8: renovation of interior of unit #4. remodel of kitchen and 4 bathrooms.
unit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms.
unit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms.
renovate, in-kind, 2 ea bathrooms - new tile, faucents, fixtures, fans & lighting. no structural modifications
recommencement and completion of work approved under pa# 2025-0807-2514
revision to pa # 202103066044: window on 2/f master suite reduced for constructability, simplifying structure, removing the remodel scope in the front portion building, no full seismic upgrade, removal of moment frames, decreasing excavation in the rear yard.
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown