Search Permits
228,282 results
14x24 ft ADU in backyard. Frame construction. Stucco exterior to match existing SFR.
CONSTRUCT A 382 SF SWIMMING POOL & 38 SF SPA, POOL HEATER, NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: RALPH M TAVARES #36352, EXPIRES 06/30/2028. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS"
New 2074 SF or 2039 SF 2 story residence with a two car garage in Hawes Crossing - Village 1. New electric, water and gas meters. Special inspection for post tension slabs. Electric Vehicle Charger. Structural Plan Sheets updated to reference Village 1 Phase 2. SD-1: The foundation chart note was updated to "Village 1," and a new chart was added for "Village 1 Phase 2." The perimeter line of Detail 40 was adjusted to allow all required notes to be included: specifications within the detail remai
A new apartment complex consisting of 4 new three-story apartment buildings and a clubhouse with associated parking, utility, drainage, and landscape improvements. Two 2" domestic water meters with 2" backflow and service lines. One 1.5" irrigation water meter with 1.5" backflow and service line.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANISION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
CONSTRUCT A 570 SF SWIMMING POOL NO SPA/NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
New 710 SF livable detached ADU and 592 SF non-livable area. Type V-B construction. Existing water meter unchanged. Upgrade electrical panel to 400 amp. Deferred truss calculations. No special inspections. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electric final, plumbing final and final.
CONSTRUCT A 700-SF SWIMMING POOL WITH NATURAL GAS HEAT. NO SPA. INSTALLATION OF 80-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 150-FT OF 1.5-IN PE GAS LINE TO 60K BTU FIRE PIT. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC AND COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. New structural and electrical. Results in CofC.
COB26-00245 - Convert Garage to Bedroom
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. D
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, and 100A single phase pedestal electrical meter. Approved as noted. Results in CofC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Tenant improvement in existing 1,532 SF, type VB construction, B occupancy (low occ) Sushi restaurant. Modification include minor interior demolition, new non-bearing walls, type 1 kitchen hood, (2) new ADA restroom, add sushi bar and relocate plumbing fixtures. Special inspection req. - grease duct wrap. Deferred fire sprinklers, fire alarm, and hood AFES. Results in CoO.
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F. See permit MST26-07852 for addenda - Code update 2024.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A EMPORIA CLASSIC LEVEL 2 WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install (1) exterior wall mounted illuminated signs with pan channel lettering: ULTRA DENTAL with logo 78.75 Sq Ft.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Case Study request to assess egress compliance proposition per the attached letter.
Fire damaged remodel like for like per plans by DOTec Engineering. Minor remodel to include: electrical, HVAC/ducts, insulation, sheetrock, new breaker panel.
Remove and replace the existing 200-amp residential electrical service panel with a new 200-amp panel in the same location. Like-for-like replacement only: no increase in service capacity, no relocation, and no new branch circuits. Existing grounding and bonding system will be verified and updated as required.
Emergency Whole home water repipe like for like
Construct 2,400 LF drainage channel along the northside of Baseline Road starting 1,000 feet east of Signal Butte Road to Springwood Blvd. Improvements also include concrete wall construction, new fencing, rip-rap installation, and all weather access path.