Search Permits
228,282 results
Please do not request inspections under this permit until 2 business days after permit issuance.Addition
Revision - include low?voltage system in this electrical permit for two ceiling?mounted devices.�Please do not request inspections under this permit until 2 business days after permit issuance.This project is a modification of the existing art room and will include the installation of new lighting fixtures, receptacles, and switches.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF; 15 LIGHT FIXTURES, 10 OUTLETS, BATHROOM FAN, GFCI FOR BATHROOM, AND CIRCUIT FOR FLOOR HEATING. REPLACEMENT OF; PANEL BOARD
Please do not request inspections under this permit until 2 business days after permit issuance.50A EV charger in garage
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Installing one dedicated 20 amp circuit and one dedicated 30 amp circuit for elevator. Install One phone line. Rough in switch, light fixture and GFI.
Please do not request inspections under this permit until 2 business days after permit issuance.SERVICE CABLE REMOUNTING
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp Heavy Up
Please do not request inspections under this permit until 2 business days after permit issuance.UNDERGROUND PANEL REPLACEMENT 200-200 AMPS
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage data cabling for network and cameras
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 18kW Generator with 16 circuit transfer switch
Please do not request inspections under this permit until 2 business days after permit issuance.New entrance cable, new fireman disconnect up to code grounded
electrical
mechanical
zoning
electrical
electrical
mechanical
electrical
plumbing
plumbing
plumbing
electrical
mechanical
Temp Standpipe for parking garage (Hardrock)
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.