Search Permits
247,466 results
Installing a new irrigation system
Total Demo of a Pool 749 sqft built in 2022. ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
BASE: Installing a backup battery system and additional meter socket.
Interior remodel of existing office spaces.
Installing a new irrigation system
ePlan: Commercial Expedited Review - [SMART HOUSING] New Construction of Dumpster Enclosure.
BASE: Installing a backup battery system and additional meter socket.
The 100-amp main disconnect will be replaced with a new Square D unit of the same amperage (the existing one is faulty and keeps tripping; the apartment is occupied so the work will be performed as an emergency call).
Abilene S402 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2
Install Level 2 EV Charger
install a full lawn sprinkler system.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Installing a new irrigation system
SMART HOUSING - new construction of an in-ground swimming pool at approved site.
ePlan: Commercial Expedited Review - [SMART HOUSING] Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center.
BASE: Installing a backup battery system and additional meter socket.
New pool and Spa
Installing a new irrigation system
BASE: Installing a backup battery system and additional meter socket.
New pool (autofill)
TEMPORARY PLUMBING PERMIT - Plumbing underground work associated with the foundations for the Office building for Project Toaster.
ePlan: Residential Expedited Review - New Construction of Second dwelling [1bed 1bath]. Existing 1-Story Single Family Res to Remain as is.
Install a temporary pole. Ref: 2026-059514 BP
Installing an ATS after the existing first means of disconnect. Installing a 22KW air cooled Generac generator. Job requires digging from the ATS to the unit from the gas meter to the unit.
ePlan: Residential Expedited Review - New Duplex Unit B New construction of a 2-Story SF Res [1bed 2bath] with attached Garage
Expose and repair waste PVC piping below the slab with an 22 tunnel from outside of foundation.
Install Level 2 EV Charger
ETJ - irrigation install
gas leak- gas pressure test needed