Search Permits
228,282 results
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01453891
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 20 MODULES, 8.2K W
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.46 KW
General construction for interior renovation of Apartment 15B as shown on drawings filed herewith. No change in use, egress or occupancy.
Construct site retaining wall for single-family residence per plan.
Construct west two-family dwelling (Establish use as duplex per land use code. Construct (2) two-family dwellings per plan. Review & process for (2) records under 7068094-CN)
Construct EAST two-family dwelling per plan. [Establish use as townhouse per land use code.. Construct two-family dwellings per plan. Review and processing for (2) construction records under 7099413-CN.]
Construct alterations to existing hospital building (Kaiser Main Bldg.) at level 1 per plan. Mechanical included.
Construct addition and alterations to existing one family residence subject to field inspection (STFI).
Establish use as housing for two attached dwelling units per land use code. Existing detached dwelling to remain. Construct new two-family dwelling per plan.
Construct deck alterations to existing one family dwelling per plan.
Install foundation shoring to existing one-family dwelling per plan.
Repair and replace in kind fire damage to a multifamily building (Celeste Apartments) at exterior deck subject to field inspection (STFI).
Construct deck addition for one family dwelling subject to field inspection STFI.
Construct alterations to rebuild portion of existing chimney per Director's Rule 7-2025 subject to field inspection [STFI].
Establish use as housing for one detached dwelling unit per land use code. Construct new one family dwelling per plan.
Construct alterations to existing townhouse (West unit) at deck for new helical pile per plan.
Construct interior non-structural alterations for master bathroom at middle level of existing one-family dwelling subject to field inspection STFI.
Tenant improvements in existing commercial building (CVS Pharmacy) per plan. Mechanical included.
Construct alterations to one-family dwelling at kitchen a bedroom and bathrooms subject to field inspection (STFI)
Construct exterior entry stairs and landing to replace existing for one-family dwelling subject to field inspection [STFI].
Construct fire damage repair to basement of Unit 5 of existing multifamily building. Repairs will be to repair and replace in kind subject to field inspection.
Construct alterations in kitchen of a one-family dwelling subject to field inspection
Re-roof of building down to existing vapor barrier and re-install new roofing of like kind.
unknown
unknown
unknown
unknown
unknown