Search Permits
228,282 results
Installation of selective storage racks and cantilever storage racks
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR AN EMPORIA LEVEL 2 WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
DEMOLITION OF EXISITING POOL AND CONSTRUCT A NEW 3,688-SF SWIMMING POOL AND 188-SF SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT NO.58912, EXPIRES 12-31-26. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WIT
Addition of a 1,240 SF covered patio, an 81 SF pool bath, a 218 SF storage/mechanical room and 602 SF shade structure to an existing SFR. Pool permit under PMT26-15371. Special inspections required: Steel, Concrete and Masonry construction, Epoxy Rebar/ Anchor Bolts installed in Concrete.
New 183 SF non-livable metal shade structure addition. Type V-B construction. Minimum required building inspections: Footing, framing and final. Refer to code case COD26-04563.
328 S.F. front porch addition attached to existing workshop/home office at existing SFR. Truss calculations deferred. Minimum required building inspections: Setbacks, footing, strap/shear, framing and final.
Sober Living Home
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. NEW 225 AMP MAIN PANEL UPGRADE SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
CONSTRUCT A 438-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT NO.58912, EXPIRES 12-31-26. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS.
CONSTRUCT A 312-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT NO.58912, EXPIRES 12-31-26. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS.
CONSTRUCT A 392 SF SWIMMING POOL & 49 SF SPA WITH NATURAL GAS HEAT. 14-FT X 18-FT ALUMAWOOD PERGOLA INCLUDED. INSTALLATION OF 133-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL EN
This permit is for installation of the temporary protective fence only. No grading, plant removal, or construction shall begin until a separate construction permit is issued. Temporary protective fence is required to remain in place at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times.
Replace 200 Amp like-for-like electrical panel and meter.
Construction activities are not restricted in general, but outside noise attributed to construction is limited to the following hours: Regular Hours (October 16 – April 30) · Monday–Friday: 6:00 a.m. to 8:00 p.m. (5:00 a.m. for concrete pouring) Summer Hours (May 1 – October 15) · Monday–Friday: 5:00 a.m. to 7:00 p.m. (4:00 a.m. for concrete pouring) · Saturday: 7:00 a.m. to 7:00 p.m. Work that generates noise outside of these hours requires approval and an after-hours permit. After-hours
Install HVAC ducting for solar panel manufactory area.
TEMP BANNER - 09/17 - 09/21
Please do not request inspections under this permit until 2 business days after permit issuance.Rough Wire, 200 amp Service and FInal
Please do not request inspections under this permit until 2 business days after permit issuance.Replace meter can/base - Need work with Pepco
Please do not request inspections under this permit until 2 business days after permit issuance.Rough Wire, 200 amp Service and Final
Please do not request inspections under this permit until 2 business days after permit issuance.Rough Wire, 200 amp Service and Final
Please do not request inspections under this permit until 2 business days after permit issuance.KITCHEN REMODEL THAT CONSIST OF DISHWASHER, REFRIGERATOR, MICROWAVE, 2 KITCHEN OUTLETS, ISLAND REC, RANGE, 7 RECESS LIGHTS, 5 UNDERCABINET LIGHTS.
Please do not request inspections under this permit until 2 business days after permit issuance.Removal and reinstallation of roof-mounted solar panels
Please do not request inspections under this permit until 2 business days after permit issuance.Replace SEC line side ConnectDER
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of Circuit Breaker and Dedicated Circuit 40 to 60 Amps 13253 Meander Cove Dr # 112, Germantown, MD 20874
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a 23-module, 10.12kW roof-mounted solar PV system
Please do not request inspections under this permit until 2 business days after permit issuance.The work consists of repulling 15 lines from panel to junction box and pulling new cable back to panel. (replacing lines)
Please do not request inspections under this permit until 2 business days after permit issuance.Installing 36 new roof-mounted solar panels at 14.76W DC
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.running a new line for wall charger level 2 tesla. 240v/60amps from main panel to garage location.
Please do not request inspections under this permit until 2 business days after permit issuance.