PermitDig

Search Permits

228,282 results

INSTALLATION OF PIPE SCAFFOLDING, NEEDLE BEAMS, AND SYSTEM BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1517 EMMONS AVENUE, Brooklyn
Sep 11

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.

27-03 DITMARS BOULEVARD, Queens
5KSep 11

HEAVY DUTY SIDEWALK SHED DURING CONSTRUCTION OF A NEW STOREFRONT, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

10 ROCKEFELLER PLAZA, Manhattan
30KSep 11

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

43 LEXINGTON AVENUE, Brooklyn
1KSep 11

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

961 46 STREET, Brooklyn
1KSep 11

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

363 CARLTON AVENUE, Brooklyn
8KSep 11

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.

53-06 ROCKAWAY BEACH BOULEVARD, Queens
5KSep 11

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

40 BROAD STREET, Manhattan
1KSep 11

TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

2029 2 AVENUE, Manhattan
Sep 11

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

1225 PARK AVENUE, Manhattan
1KSep 11

ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

58-12 QUEENS BOULEVARD, Queens
6KSep 11

Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.

670 BROADWAY, Manhattan
Sep 11

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

900 WEST END AVENUE, Manhattan
1KSep 11

Plumbing work in conjunction to Alt-CO filing. New Bathroom, kitchen on 1st floor, direct replace stove and new bathroom on 2nd floor and replace shower on Attic.

59 BAY 29 STREET, Brooklyn
4KSep 11

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR EXTERIOR FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

320 DITMAS AVENUE, Brooklyn
17KSep 11

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1601 SAINT JOHNS PLACE, Brooklyn
10KSep 11

SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS

82 RUTGERS SLIP, Manhattan
Sep 11

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

320 WEST 96 STREET, Manhattan
9KSep 11

INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

60 EAST 96 STREET, Manhattan
1KSep 11

Plumbing work filed in conjunction with application B01361174-S4

8309 12 AVENUE, Brooklyn
Sep 11

CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE ON SIDEWALK/ROADWAY.

10 ROCKEFELLER PLAZA, Manhattan
15KSep 11

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

134-03 CHENEY STREET, Queens
37KSep 11

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

2970 3 AVENUE, Bronx
0KSep 11

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

410 6 AVENUE, Manhattan
5KSep 11

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

755 WEST END AVENUE, Manhattan
20KSep 11

Temporary structures for TCE presents events at the Brooklyn Army Terminal parking lot outdoors. Removed at the end of the programing. No changes to existing structures, use or egress.

140 58 STREET, Brooklyn
20KSep 11

Proposed to convert existing 3 story building from mixed use to 3 dwelling units. General construction and mechanical work as per plan submitted. No change in bulk. Obtain a new C of O.

32-42 45 STREET, Queens
512KSep 11

Architectural work on the 7th and 12th as indicated on drawings.

7 WEST 34 STREET, Manhattan
1.6MSep 11

INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, SYSTEM SCAFFOLD AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

95 AMITY STREET, Brooklyn
50KSep 11

IRA to assist in Condition Assessment

40 RECTOR STREET, Manhattan
Sep 11