Search Permits
227,194 results
plumbing and sprinkler work proposed for new eating and drinking establishment, accessory kitchen, mechanical equipment at 1st , cellar and mezzanine respectfully
PROPOSED PARTIAL INTERIOR RENOVATION WORK WITH INSTALLING NEW PARTITIONS AND REPAIRING FLOORING, CEILING ON CEL, 1ST AND 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior renovation. New non-load bearing partitions, finishes, and lighting fixtures. No changes to use, occupancy, or egress.
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Temporary tents for a film shoot in open space adjacent to the USTA L.A. Stadium. Removed at the end of the programing. No changes to existing structures, use or egress.
HEREWITH FILE TO INSTALL PLUMBING FIXTURES WITH ASSOCIATED ELEMENTS FOR GROCERY STORE RENOVATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 7TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FLOOR (MECHANICAL ROOM) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Install of temp tents, decking, trussing, no alt to exist structures for Seasonal Roebling Rink. TPA permit req. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event complete.
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR CONSTRUCTION WORK AT 87-90 258 STREET, QUEENS, NY 11001 DOB JOB#Q01462297-I1
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.
INSTALL BATHROOM AND KITCHEN PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of structural framework for greenhouse as per plans.
Install new plumbing fixtures as per plan. There is no change of use, egress, or occupancy filed under this plan
THESE PLANS HAVE BEEN PREPARED FOR A MINOR ALTERATION, OUTLINING THE FOLLOWING SCOPE OF WORK:THE DOCUMENTATION OF NUMBER AND LOCATION OF GASFIRED FIXTURES WITHIN THE CELLAR AND FIRST FLOOR COMMERCIALSPACE NO CHANGE IS PROPOSED TO USE, EGRESS, OR OCCUPANCY
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING.
Install HVAC units on Roof to serve building floors and obtain Certificate of Compliance. No change in use, egress and occupancy
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE OPEN PORCH AND STAIR AT FRONT YARD AS
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
NYC DEV HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHOP2) - MECHCANICAL FILING FOR SUPPORTIVE HOUSING (RESIDENTIAL & NON-PROFIT INSTITUTION WITH SLEEPING ACCOMODATIONS) IN CONJUNCTION WITH NEW BUILDINGS B00848066, B00848051, B0084784
Plumbing filed in conjunction with ALT-1 B01364884-I1
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Fire restoration of existing 1-story brick commercial building which including seven(7) existing U.G 6 stores. Works including minor patching & painting, but some stores require total renovation. No change in use, egress, & occupancy.