PermitDig

Search Permits

227,194 results

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

623 5 AVENUE, Manhattan
0KOct 6

DIRECT REPLACEMENT OF ONE CONDENSING ROOFTOP UNIT. NO CHANGE TO USE, OCCUPANCY, STRUCTURE, OR EGRESS

252 ATLANTIC AVENUE, Brooklyn
12KOct 6

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

409 EAST 60 STREET, Manhattan
5KOct 6

Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

88 UNIVERSITY PLACE, Manhattan
3KOct 6

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.

94-09 148 STREET, Queens
10KOct 6

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

391 CLERMONT AVENUE, Brooklyn
5KOct 6

INSTALLATION OF STAIR TOWER SCAFFOLDING AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

161 MARSHALL STREET, Brooklyn
1KOct 6

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

35 DASH PLACE, Bronx
9KOct 6

ERECT AN ILLUMINATED BUSINESS ACCESSORY WINDOW SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

901 BROADWAY, Manhattan
1KOct 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

409 EAST 78 STREET, Manhattan
1KOct 6

INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

47 WEST 20 STREET, Manhattan
1KOct 6

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

61 CLARKSON AVENUE, Brooklyn
10KOct 6

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

17 ESSEX STREET, Manhattan
6KOct 6

FACADE RESTORATION, INSPECTIONS

140 WEST 79 STREET, Manhattan
Oct 6

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

94-11 148 STREET, Queens
Oct 6

INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

736 HALSEY STREET, Brooklyn
20KOct 6

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

49 BEACH STREET, Manhattan
0KOct 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

922 MADISON AVENUE, Manhattan
1KOct 6

PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR EXISTING BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

18 EAST 48 STREET, Manhattan
2KOct 6

INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.

175 ADAMS STREET, Brooklyn
Oct 6

CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PARK AVENUE, Manhattan
2KOct 6

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

94-09 148 STREET, Queens
Oct 6

Alterations to sprinkler system on 7th and 9th floors as per plans. No change to use, egress or occupancy.

437 FIFTH AVENUE, Manhattan
45KOct 6

Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

146-01 45 AVENUE, Queens
0KOct 6

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

2865 BRIGHTON 3 STREET, Brooklyn
20KOct 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

481 WYTHE AVENUE, Brooklyn
1KOct 6

Installation of mechanical units as shown on plans filed herewith.

150 SOUTH 2 STREET, Brooklyn
115KOct 6

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

34 EAST 64 STREET, Manhattan
5KOct 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.

375 WEST END AVENUE, Manhattan
1KOct 6

INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

656 6 AVENUE, Manhattan
1KOct 6