Search Permits
13,725 results · type: plumbing
INSTALLATION OF 220-FT OF 2-IN PE GAS LINE BURIED 18IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, ALL NEW PERMITTED PROJECTS NOT SPECIFICALLY C
Installation of 90-ft of 1.25-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 100K BTU fireplace, 25-ft of 1.25-in PE gas line to 60K BTU BBQ. All gas lines are to be installed per 2018 IFGC & SW gas requirements. SW gas to determine if the meter needs to be upgraded. Effective January 8, 2026, the City of Mesa adopted 2024 ICC and 2023 nec. An approved code modification was added to this permit allowing continued compliance with 2018 ICC and 2017 NEC. Starting April 8,
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
RESIDENTIAL
RESIDENTIAL