Search Permits
12,661 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
COTAland Star Flyer Swing Shade Structure (ATR-3)
Replacement of complete existing central heat and air system with or without duct work main downstairs and upstairs system only (2 of 3 at the home)
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Interior remodel and garage conversion to add bedroom closet bathroom and utility room. Remove the existing cover over the rear patio and grass area and construct pergola covered deck (less than 36 above grade) over the existing concrete patio. New asphalt shingle roof. No change to the front porch.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
EPLAN REVIEW: remodel Big Bend Auditorium - 1st Floor.
COTAland Drop Tower & Equipment BLDG. ATR 21 [7 Day Review] Multi-App (5)
Replacement of complete existing central heat and air system with or without duct work
1 of 3 Unit 4-story Multi-Family Building with 4 Bedrooms and 5 bathrooms Game Room Covered Porch and Covered Deck on 2nd & 4th Floor Storage on 4th Floor with Attached 2 Car Garages. (Suite 10) SP-2017-0130C.SH -Approved
ePlan: Commercial Expedited Review - New Construction of Fitness Amenity Bldg. (3052 SF)
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Connect mobile home and add front deck 6x8 and rear deck 4x4
ePlan: Commercial Expedited Review - First Time Finish-Out of Elevator Lobby Area (260 SF).
ePlan: Residential Expedited Review - New TWO/THREE UNIT RES. BLDG 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath]
MOVED DUCTWORK TO EXPAND ATTIC STORAGE 5/12/26 IM ALSO INSTALLING MINI SPLIT IN GARAGE
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Gulseren Mutlu ATX
1 of 3 Unit 4-story Multi-Family Building with 4 Bedrooms and 5 bathrooms Game Room Covered Porch and Covered Deck on 2nd & 4th Floor Storage on 4th Floor with Attached 2 Car Garages. (Suite 11) SP-2017-0130C.SH -Approved
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1512 (5764 SF)
ePlan: Commercial Expedited Review - First Time Finish-Out for 15th Floor Common Area (1377 SF).
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1510 (3675 SF)
Replacement of complete existing central heat and air system with or without duct work
Express: non structural interior remodel drywall repair/replacement interior finish updates and 1 bathroom tub/shower conversion bathroom work to tub/shower and surrounding wall finishes only no walls are moved and no plumbing fixtures are added or relocated electrical plumbing and mechanical work limited to non structural
mechanical_permit_(r)
Remove 2 Existing DOAS Units and Install 2 New DOAS Units