Search Permits
247,466 results
[A B 2533] - Legalize A D U
New Pool.
Legalize Ground Mount P V System & Battery Back Up
Replace (E) Tile Pricing Sign Face With New L E D Pricing Face.
Replacing Two Sign Faces On The Mid Pole Sign.
Pool Replaster. Wading Pool Replaster.
Legalize Agriculture Building Used For Horticulture And Storage; Deck - Ag Exempt
(N) Addition And Remodel, (N) Front Entry Porch And Bay, (N) Skylights (N) Windows And Doors (N) Meter And Circuits
Construct new 5 story 164 guestroom hotel
Addition to existing Group I-2, Condition 2 rehabilitation hospital. Scope includes a new approximately 13,233-square-foot, construction type II-B, 20-bed patient-care addition: new smoke compartment and smoke barrier construction: associated patient rooms, support spaces, life-safety modifications, structural, MEP's, medical gas, and civil. Deferred fire sprinklers, fire alarm, access control, steel joists. Special inspection of steel, concrete, high-strength bolting, cold formed deck, post-ins
Install (1) exterior wall mounted illuminated sign with channel letters BATH & BODY WORKS 61.63 sf.
FIRE DAMAGE PERMIT RELATED TO COB25-00173 Fire Damage of existing 4-unit multifamily residential group R2 occupancy, 3,300 SF bldg of existing CMU block construction, non-sprinklered. Fire damage repair to include replacement of portion of damaged roof and wood trusses, mechanical equipment and system replacement, full replacement of plumbing waste-vent and water dist. system, and new electrical SES, panel and system replacement. In addition to fire damage repair, scope to include addition of 3r
Tenant improvement within building 3's shell vault 2.3. Shell building is type II-B construction, unlimited area building, mixed group B/S-1 occupancy. Scope includes mechanical and electrical equipment associated with the data vault. Including electrical distribution, equipment power, grounding, lighting, mechanical cooling/piping systems, and controls. Deferred fire alarm, fire sprinkler, and HMA. No new utility meters. Related to shell permit PMT24-17530. Special inspection for electrical, fi
Tenant improvement within building 3's shell vault 1.3. Shell building is type II-B construction, unlimited area building, mixed group B/S-1 occupancy. Scope includes mechanical and electrical equipment associated with the data vault. Including electrical distribution, equipment power, grounding, lighting, mechanical cooling/piping systems, and controls. Deferred fire alarm, fire sprinkler, and HMA. No new utility meters. Related to shell permit PMT24-17530. Special inspection for electrical, fi
New development of a 5-story, 36-unit, 64,594 gross SF (50,813 net SF), type III-A construction, R-2 occupancy multifamily apartment building with site improvements including parking, accessible routes, site lighting, trash enclosure, sidewalks, striping, and signage. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Special inspection req. steel, concrete, masonry, special cases - post-installed anchors, soils. EIFS and Fire resist
Tenant improvement within building 3's shell vault 1.2. Shell building is type II-B construction, unlimited area building, mixed group B/S-1 occupancy. Scope includes mechanical and electrical equipment associated with the data vault. Including electrical distribution, equipment power, grounding, lighting, mechanical cooling/piping systems, and controls. Deferred fire alarm, fire sprinkler, and HMA. No new utility meters. Related to shell permit PMT24-17530. Special inspection for electrical, fi
Tenant improvement within building 3's shell vault 1.1. Shell building is type II-B construction, unlimited area building, mixed group B/S-1 occupancy. Scope includes mechanical and electrical equipment associated with the data vault. Including electrical distribution, equipment power, grounding, lighting, mechanical cooling/piping systems, and controls. Deferred fire alarm, fire sprinkler, and HMA. No new utility meters. Related to shell permit PMT24-17530. Special inspection for electrical, fi
Tenant improvement within building 3's shell vault 2.2. Shell building is type II-B construction, unlimited area building, mixed group B/S-1 occupancy. Scope includes mechanical and electrical equipment associated with the data vault. Including electrical distribution, equipment power, grounding, lighting, mechanical cooling/piping systems, and controls. Deferred fire alarm, fire sprinkler, and HMA. No new utility meters. Related to shell permit PMT24-17530. Special inspection for electrical, fi
Upgrade electrical meter and panel from 100A to 200A single phase meter at an existing building. Results in CofC.
CONSTRUCT A 1028 SQ FT SWIMMING POOL / SPA. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
Install spare fuel piping and conduit for future generator and tank upgrades. Results in CofC.
Install new 1000 gallon propane tank and associated equipment for refilling portable tanks at existing hardware store. New concrete pad, bollards, and masonry screen wall. New electrical and structural. Special inspections required: masonry construction. Per approved ADM26-00403 1. Remove two parking spaces along the southwest corner of the building, one for the installation of a new 1,000 -gallon, above-ground propane storage tank. The space directly to the east of the proposed tank will become
Gusset Plate on Truss needs to be pressed and secured to complete truss repair ate existing SFR. Reference MST23-05487, TAYLOR MORRISON #3527. Inspector to field verify truss calculations/design.
New 527 SF livable addition including full bathroom, kitchenette, bedroom, and family room. Remove existing 200 amp service and install new 225 amp service with additional 100 amp panel to serve the addition. Type V construction. R5 occupancy. Deferred truss calculations. Special inspections for rebar epoxy at foundation.
TI of existing Banner outpatient imaging suite 6,951 SF. Scope includes the renovation of class 1 imaging spaces, including Mammography, Dexa, X-Ray and Ultrasound rooms, as well as the necessary clinical support and staff spaces. This also includes MEP's, limited structural, and finished. Special inspection for structural items. Deferred fire sprinklers and fire alarm. Dem permit: PMT25-20802.
TEMP BANNER
New detached ADU – 550 S.F. livable. Single-story accessory dwelling unit at existing single-family residence. Includes living area, kitchen, bedroom, and bathroom. Type V construction. R-5 occupancy. Truss calculations deferred.
renovation_(structural_or_non-structural)
electrical_vacancy
construction_loop