Search Permits
217,870 results
CHANGING OUT 4 METER SECTION FOR UNITS#1-4 REPLACEING IN SAME LOCATION
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 5: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defer
Single family detached Dream Finders Homes Plan 2 master plan application Master plan for new 1801 S.F livable, 587 S.F. non-livable. 2 story - single-family home construction. Type V-B construction. R-5 occupancy. New ¾” water and 200 amp electric meter. New gas meter. Special inspections required for post-installed anchors in PT slab, reinforcing steel-prestressing tendons. Truss Calcs and fire sprinklers deferred. EV-Charger in garage.
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information. Square footages updated for both MST23-15066 & MST25-01482.
“Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permi SES Panel Replacement Replace existing electrical service entrance section (SES) panel with new 200A SES panel in same location per SRP design. SRP Work Order T3728525.
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 6: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
Converting tub to tub, replacing pan, drain, and valves. Converting shower to shower, replacing pan, drain, and valves.
NEW 2961 SF TWO STORY RESIDENCE WITH A 2+ CAR GARAGE AT HAWES CROSSING. INCLUDES WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTION FOR POST TENSION SLABS. SEE MST23-15248 FOR PARCEL A, B, D AND E OF HAWES CROSSING. ADDENDA MST25-01487 ADD PARCEL H & F, REVISE PARCEL A, D, B AND E INFORMATION.
New detached 384 SF Aluma-wood pergola w/ 8' high media wall with some electrical improvements per engineered plans. (swimming pool, & gas on separate permit).
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 2: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
Converting shower to shower, replacing pan, drain, and valves.
Dream Finders Homes Plan 3 - Master Plan – New Two Story Single Family Residence – Total livable area 2178 SF and total non livable area 703 SF. Type V construction. R-5 occupancy. New three quarter inch water meter, gas load 449000 BTU, and 200 amp electrical panel. Deferred submittals: truss drawings and fire sprinklers. Special inspections required for steel construction, concrete construction, and soils. Deferred Truss Calcs, and sprinklers. EV-Charger in garage.
New development of a 118,302 SF, 161 unit, 6-story mix-use building comprising of 5-story type III-B construction apartment units above a 1-story type I-A construction parking garage with commercial space. Special inspections req. - Steel, concrete, wood, soils. Mastic and intumescent fire-resistant coatings, fire-resistant penetration & joints and Electrical equipment rated at or above 1,000 amps. Special inspection for Emergency Responder Radio Coverage. Deferred fire sprinklers, fire alarm, a
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
Fabricate and install non-illuminated reverse pan wall sign GCE INC GEORGE CAIRO ENGINEERING, INC 51 sq ft.
• Installation and/or modification of electrical wiring, devices, lighting, and equipment as required by project plans and field conditions • Installation of branch circuits, home runs, and terminations • Installation of lighting fixtures, switches, dimmers, and receptacles • Electrical connections for mechanical equipment and specialty systems • Upgrades and modifications to existing electrical systems as required
T-pole.
complete construction on this property - single family two story home with driveway. Structure exists with roof but interior needs to be finished with electrical, plumbing, HVAC, etc. Previous permit under previous homeowner - 20-37259-NEWC 2,223 sq.ft conditioned space to be finished per approved plans
Gunite pool wiring
Install (2) 12k BTU Mini Splits and (1) 2 Ton Central 8kw Heat
File for a tankless gas water heater for the property address 3940 Thalia st
Installation of a 22kw whole home generator & 200amp transfer switch & 80ft gas line
Wire new in ground pool
A) Receive & install (1) 5’-3” to 13’-6” ( O’Reilly ) LED illuminated cloud channel & (1) set of 1’-7” ( AUTO PARTS ) LED illuminated channel letters. Display pre-attached on 13’-6”, 4’-0” & 4’-9” mounting raceways. B) Receive & install (1) 5’-3” to 13’-6” ( O’Reilly ) LED illuminated cloud channel & (1) set of 1’-7” ( AUTO PARTS ) LED illuminated channel letters. Display pre-attached on 13’-6”, 4’-0” & 4’-9” mounting raceways. MONUMENT SIGN - C) Receive & install (1) 3’-0” x 10’-0” D/F ( O’
Replacing the top half of the meter service
Run 25 feet of gas line for tankless water heater and hookup tankless. Pressure test gas line for six month gas test
fire job, repair gas line and have inspected. Adding water heater, room heater, stove and dryer.
HVAC Installation
Replace existing 5 ton condenser, furnace and evap coil