Search Permits
12,661 results · type: mechanical
vacancy gas over 6 months
Install (2) 2 Ton Bryant Single Stage System, Supply Air Plenum, Return Air Plenum, R-8 Flex Duct Runs, White Steel Grilles, Pro 701 Thermostat, Run Refrigerant Lines, Safety Switch, Vent Bathroom Exhausts, Provide Manual J, D, S
File for a gas vacancy and a water heater for the property address 7535 Vanderkloot Avenue
GAS VACANCY- RELEASE METER
GAS VACANCY- METER RELEASE
GAS VACANCY- METER RELEASE
gas vacancy- meter release
Install regulators for fixtures and replace 40' section of 2-1/2" piping with 2" piping to upgrade gas system to 2 PSI.
6 months gas inspection
Duct alterations for 5th floor
Replace 4 ton condenser and air handler
Replace 2 ton condenser, furnace, and evap coil
Replace existing 2 ton condenser and air handler
Install 2-3 ton AC with electric Air Handler.
Install 2- 3 ton ac with electric air handlers
Gas vacancy inspection
Gas vacancy inspection
Install/supply 11 electric tank water heaters & 1 on-demand electric tankless water heater
change out for 5 ton ac unit
New electric water heater
New electric water heater
New electric water heater
New electric water heater
New electric water heater
New electric water heater
mechanical
mechanical
mechanical
mechanical
mechanical