Search Permits
176,051 results
Vacancy
Non-structural renovation of double residence- update flooring, painting, plumbing, electric and gas
Replace overhead service with underground service
Replace overhead service with underground service
House panel replace over head service with underground service
Replace overhead service to underground service
Building is going from overhead service to underground service.
Meter out over 6 mths
install a 26w generator
installing one 26k generator
New gas line. New water heater, stove, dryer, and A/C
Building an inground 15' x 25' swimming pool with spa, bench, and depths of 3.5' to 5.5'. To be done as per scope. The garage, storgae areas, bathroom, and outdoor kitchen to be built under seperate permits.
Total home rewire. Demo old fixtures, wiring and panel. Install new wiring, devices, 200amp service with arc fault breakers, whole home surge protection and grounding system.
Gunite pool wiring
Gunite pool wiring
Trim out and power release
Existing roof replacement
Conversion of current attached garage to a primary bedroom and bathroom. Convert existing enclosed patio to a den. Remodel of kitchen and bathrooms and adding a half bath and laundry room from existing space.
Tear off existing roofing material and replace with fortified certified roofing system. Bond Break double underlayment install Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Vacancy inspection
Vacancy inspection
Vacancy Permit
Install Phase Protection System in Main electrical Panel
Electric water heater installed
Electric water heater installed
Install one temporary banner
Add 3) 120v Circuits. Relocate Switches, Lights, and Outlets to match required layout.
Replacing the meter pan and trough
Lower light switches 1-2". Relocate receptacles if needed.
lower switches 1" to 2", relocate receptacles if needed