Search Permits
176,050 results
building
building
building
building
building
building
building
building
NEW SFR - LOT 21 (LOT NOT ON LAL BLANKET)
OAKS 34 Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 30-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 33- Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 24-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
construction of new residential swimming pool
OAKS 31-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
New pool and decking
OAKS 36-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 103-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 104-Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 72- Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
OAKS 5- Install NEW replacement mobile home and attach water and sewer to existing stub ups, connect AC and electric, install concrete sidewalks/driveway, and attach wood stairs.
New SFR - Lot 15 Blk 31 - 2 story - 5/4.5/3
HURRICANE/RE-ROOF • Shingle roof replacement, peel and stick underlayment • 35 SQ 5/12 Pitch
NEW SFR - LOT 29
CSR/SFR/BLKT LAL
Revised plans showing panel roof and related details for installation.
No electrical work is going to be donde under this scope of work, we weould like to to remove it from the renovation please
revised site plan to match construction plan
move equipment to side of house
Revision to change the door hardware one of the 2 exit doors. Also rear exit door (E3) has been changed to receive an access control card reader and electric strike. Please see the Narrative Letter that clarifies the requested changes.