PermitDig

Search Permits

212,046 results

INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

911 OGDEN AVENUE, Bronx
6KJun 2

TEMPORARY SUSPENDED SCAFFOLD SYSTEM DURING BLDG CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

9 DEKALB AVENUE, Brooklyn
Jun 2

INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC

1680 METROPOLITAN AVENUE, Bronx
20KJun 2

INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC

4-12 49 AVENUE, Queens
50KJun 2

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

2 LEXINGTON AVENUE, Manhattan
0KJun 2

INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC

1561 UNIONPORT ROAD, Bronx
20KJun 2

INSTALL NEW VRF INDOOR UNITS, MODIFY DUCTWORK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY

45 EAST 53 STREET, Manhattan
173KJun 2

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

140 EAST 81 STREET, Manhattan
30KJun 2

WORK IS LIMITED TO THE REPAIR AND RESTORATION OF FIRE-DAMAGED ROOMS AND THE INSTALLATION OF NEW CODE-COMPLIANT WINDOWS IN AFFECTED BEDROOMS.

286 EAST BURNSIDE AVENUE, Bronx
30KJun 2

INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

14 WASHINGTON PLACE, Manhattan
40KJun 2

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

89-38 164 STREET, Queens
5KJun 2

STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION

40 WEST 4 STREET, Manhattan
3KJun 2

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

39 EAST 83 STREET, Manhattan
2KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

52 WEST 28 STREET, Manhattan
5KJun 2

INSTALLATION OF OUTRIGGER FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.

92 READE STREET, Manhattan
Jun 2

STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION

14 WASHINGTON PLACE, Manhattan
5KJun 2

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

311 EAST 14 STREET, Manhattan
5KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

330 WEST 42 STREET, Manhattan
10KJun 2

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1250 BROADWAY, Manhattan
9KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

1176 BUSHWICK AVENUE, Brooklyn
14KJun 2

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

106 WEST 139 STREET, Manhattan
7KJun 2

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

104 WEST 139 STREET, Manhattan
7KJun 2

INSTALL NEW AC SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.

35 WEST 4 STREET, Manhattan
10KJun 2

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

2033 MCGRAW AVENUE, Bronx
13KJun 2

suspended scaffold for facade inspection

203 WEST 81 STREET, Manhattan
Jun 2

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

9511 SHORE ROAD, Brooklyn
1KJun 2

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

295 SAINT JOHNS PLACE, Brooklyn
1KJun 2

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

137 RIVERSIDE DRIVE, Manhattan
1KJun 2

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

92-23 168 STREET, Queens
Jun 2

SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 1749 GRAND CONCOURSE, BRONX, NY 10453

1749 GRAND CONCOURSE, Bronx
Jun 2