Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

313 WEST 20 STREET, Manhattan
3KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

220 PARK PLACE, Brooklyn
10KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

144-02 94 AVENUE, Queens
5KJun 2

9' CURB CUT 116' FROM LACONIA AVENUE

376 ATLANTIC AVENUE, Staten Island
Jun 2

9' CURB CUT 91' FROM LACONIA AVENUE

378 ATLANTIC AVENUE, Staten Island
Jun 2

9' CURB CUT 125' FROM LACONIA AVE

374 ATLANTIC AVENUE, Staten Island
Jun 2

9' CURB CUT 66' FROM LACONIA AVE

382 ATLANTIC AVENUE, Staten Island
Jun 2

ERECT ACCESSORY BUSINESS SIGN FOR WINGSTOP, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

149-05 NORTHERN BOULEVARD, Queens
4KJun 2

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

113-05 JAMAICA AVENUE, Queens
5KJun 2

PROPOSED INSTALLATION OF SUPPORTED SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION

409 PUTNAM AVENUE, Brooklyn
5KJun 2

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

4555 WHITE PLAINS ROAD, Bronx
1KJun 2

Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.

200 EAST 89 STREET, Manhattan
Jun 2

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

11 STERLING PLACE, Brooklyn
9KJun 2

TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SCAFFOLD SHALL BE INSTALLED IN PHASES.

177 9 AVENUE, Manhattan
75KJun 2

SUSPENDED SCAFFOLD AND HOIST INSTALLATION FOR EXTERIOR WORK.

348 BEEKMAN AVENUE, Bronx
Jun 2

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

158 FRANKLIN STREET, Manhattan
4KJun 2

Mechanical modifications and associated duct piping. No change in use egress or occupancy.

270 LAFAYETTE STREET, Manhattan
6KJun 2

Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

39 EAST 83 STREET, Manhattan
2KJun 2

STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION

50 WEST 4 STREET, Manhattan
5KJun 2

INSTALLATION OF TEMPORARY SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

2626 BROADWAY, Manhattan
1KJun 2

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

588 THOMAS S BOYLAND STREET, Brooklyn
1KJun 2

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

629 UNION STREET, Brooklyn
5KJun 2

INSTALLATION OF PIPE SCAFFOLD AT 4 WEST 58 STREET MANHATTAN NY 10019 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

4 WEST 58 STREET, Manhattan
10KJun 2

Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting documents

601 18 STREET, Brooklyn
10KJun 2

INSTALLATION OF TEMPORARY ROOF PROTECTION& OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

2 LEXINGTON AVENUE, Manhattan
1KJun 2

Installation of suspended scaffold for facade inspection/repair.

17 EAST 89 STREET, Manhattan
Jun 2

INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.

236 BUTLER STREET, Brooklyn
Jun 2

CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

620 ATLANTIC AVENUE, Brooklyn
1KJun 2

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

638 EAST 12 STREET, Manhattan
0KJun 2

RENOVATION ON EXIST. COMMERCIAL SPACE WITH, NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

6109 7 AVENUE, Brooklyn
9KJun 2