Search Permits
176,002 results
We will be making an access hole and tunneling 8ft to make repairs to the drain line
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 3bath] with Attached Carport. Bldg 2
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: Remove and replace existing 2-ton horizontal gas HVAC system
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of Shell Space for Retail Phase I - First Floor. Work to include Patio Space - Not for Occupancy.
Replacement of complete existing central heat and air system with or without duct work **BRIAN KING: Replacing like for like 3T vertical gas HVAC system. No structural changes.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 2
Install AE Meter with riser from existing main panel on power pole
Replacement of complete existing central heat and air system with or without duct work **SHONDA NOVAK: Replace existing 2-ton HVAC system with like-for-like unit (HVAC changeout/alteration). No structural change.
irrigation install
Magellan S419 C Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of Leasing and Amenities Phase I First Floor. Work to include CoWork Space Fitness and Mail Room.
ePlan: Residential Expedited Review - New Autofill/Heated Pool. Bldg 1
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 4bath] Work to include: Second Floor Addition Mold remediation to include: Remove impacted drywall cabinetry trim insulation ceiling materials and Other affected porous materials only as required by the remediation protocol.
New construction sfr in the etj 2771 sqft
Install of new structural steel members Replace broken tilt wall panels Repair TPO Roof.
AISD Sadler Means ES Irrigation Permit
Remodel kitchen pantry and utility closet. Replace kitchen window. Pantry relocated to utility closet splitting existing pantry into coffee bar and living room closet.
Tpole
Tx gas has a leak on the gas main and is replacing the steel pipe with poly pipe and wants us to move the gas meter away from the tankless 10 away to be in compliance with the gas regulations.
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1511 (4302 SF)
New pool 410 sf
Plumbing for New Construction of SFR in the ETJ 2262 sq ft
Replacement of complete existing central heat and air system with or without duct work
Express: Foundation repair
Installing a backup battery system and additional meter socket.
100amp replacement of main breaker panel. No meter work done. Austin Energy is the electric provider.
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of Parking Garage for Mixed Use 7-Story Multi-Family Complex.
Plaster walls and ceiling replace recessed cans throughout entire home Add additional shower head in primary