Search Permits
211,158 results
Interior remodel of lobby area including structural, mechanical, and electrical. Deferred fire sprinklers and fire alarms.
Brighton Companies Plan 2 Master plan for new 2094 S.F livable, 677 S.F. non-livable. 2 story, Single-family home construction. New water and electric meters. Type V construction. R-5 occupancy. New 3/4-inch water meter, 200 amp electrical. Special inspections required for Steel construction - reinforcing steel incl pt tendons and anchors, Concrete construction 1705.3 / table 1705.3, Soils - pad cert. and Post-installed anchors. Truss Calcs deferred.
Brighton Companies Plan 2 Master plan for new 2094 S.F livable, 677 S.F. non-livable. 2 story, Single-family home construction. New water and electric meters. Type V construction. R-5 occupancy. New 3/4-inch water meter, 200 amp electrical. Special inspections required for Steel construction - reinforcing steel incl pt tendons and anchors, Concrete construction 1705.3 / table 1705.3, Soils - pad cert. and Post-installed anchors. Truss Calcs deferred.
Carport to Garage conversion with storage addition and a 280 SF extension.
New 2074 SF or 2039 SF 2 story residence with a two car garage in Hawes Crossing - Village 1. New electric, water and gas meters. Special inspection for post tension slabs. Electric Vehicle Charger. Structural Plan Sheets updated to reference Village 1 Phase 2. SD-1: The foundation chart note was updated to "Village 1," and a new chart was added for "Village 1 Phase 2." The perimeter line of Detail 40 was adjusted to allow all required notes to be included: specifications within the detail remai
New pool and spa. New electrical, structural, and pool equipment only. Pool fence to be installed on a separate permit, hold pool final until pool fence permit has been approved. New 200A 3phase electrical meter. Pool barriers under PMT26-06940. Results in CoC.
COD25-06764 If necessary, I am applying for a permit/inspection of my pre existing slotted sun shade patio cover that was constructed in 2009.
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information.
SHEA HOMES #4026 - New 3133 SF two story residence with a 2+ car tandem garage in AVALON CROSSING. New gas, water and electric meters. Special inspection for pot tensions slabs
Lennar #2016-New 1744 SF two story residence with a 2 car garage for Hawes Crossing - Village 1. Includes a side yard covered patio and a garage with alley access. Special inspection for post tension slabs. Structural Plan Sheets updated to reference Village 1 Phase 2. S-2 & S-2.1: Stair Detail 3A corrected to SD-2 - Floor Truss Schedule for Plan 2, Elev. C updated to show FIDT. S-3: Rear wall detail callouts added for Plan 1, Elev. A. SD-1: Foundation chart note revised to specify -Village 1-ne
SHEA HOMES #4026 - New 3133 SF two story residence with a 2+ car tandem garage in AVALON CROSSING. New gas, water and electric meters. Special inspection for pot tensions slabs
Brighton Homes Plan #1 - Master plan for new 1792 S.F livable, 659 S.F. non-livable. Two story with a 2 car garage. - Type V-B construction. R-5 occupancy. New ¾” water meter. New electric meter. Special inspections required for steel construction - reinforcing steel incl pt tendons and anchors, concrete construction, post-installed anchors, and soils - pad cert. Deferred Truss Calcs and engineered joist. EV-Charger
New 2074 SF or 2039 SF 2 story residence with a two car garage in Hawes Crossing - Village 1. New electric, water and gas meters. Special inspection for post tension slabs. Electric Vehicle Charger. Structural Plan Sheets updated to reference Village 1 Phase 2. SD-1: The foundation chart note was updated to "Village 1," and a new chart was added for "Village 1 Phase 2." The perimeter line of Detail 40 was adjusted to allow all required notes to be included: specifications within the detail remai
Tenant improvement, to a pottery studio 1,892 SF type VB, assembly occupancy. Adding mezzanine, restrooms, Kilns, HVAC, and MEPs. New 400 AMP electrical meter. Deferred fire sprinklers, fire alarm, and access control. Results in a CofO.
Interior demolition of existing tenant space 1800 sq. ft. limited to grid ceiling, lighting & HVAC ductwork IT DEMO ONLY, OTC APPROVED BY CC
Brighton Companies Plan 2 Master plan for new 2094 S.F livable, 677 S.F. non-livable. 2 story, Single-family home construction. New water and electric meters. Type V construction. R-5 occupancy. New 3/4-inch water meter, 200 amp electrical. Special inspections required for Steel construction - reinforcing steel incl pt tendons and anchors, Concrete construction 1705.3 / table 1705.3, Soils - pad cert. and Post-installed anchors. Truss Calcs deferred.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Pool barrier for 1,647SF, A-3 occupancy of the pool area and 6 FT south property line fence. Pool under PMT25-13040. Special inspection required for masonry, concrete, and post-installed anchoring. Reviewed as noted. Results in CoO for pool area.
Install fire alarm system with occupant notification device in an existing facility. Group M occupancy.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 28-FT X 52-FT ABOVE GROUND 2026 CHAMPION SERIAL NO. 157-00P-H-A006915A/B WITH A/C AT REAR. NO GAS. UPGRADE ELECTRIC PEDESTAL FROM 100AMPS TO 200AMPS. ONE DETACHED 18 FT X 20 FT AWNING ICCESR 4436. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MIN TWO 9 FT X 18 FT PAVED 2-IN ASPHALT OR 4-IN CONCRETE UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ONE PARKING SPACE REQUIRED TO BE COVERED. 40-FT X 85-FT INTERIOR LOT. MIN SET
TAYLOR MORRISON #4021 - HAWES CROSSING - NEW 1938 SF SINGLE STORY RESIDENCE WITH 2 CAR GARAGE AND TANDEM GARAGE OPTIONS. NEW WATER, GAS AND ELECTRIC METERS. REQUIRES POST TENSION SLAB SPECIAL INSPECTIONS. ADDENDA MST25-01218 - SHEET S1.01 · ADDED PARCEL H INFORMATION · REVISED GEOTECHNICAL REPORT DATES · ADDED PARCELS BLOCK · ADDED 9" TO SHEET TITLE SHEET S1.02 · ADDED 9" TO SHEET TITLE · ADDED PARCELS BLOCK SHEET S1.03 · ADDED PARCEL H INFORMATION · REVISED GEOTECHNICAL REPORT DATES · ADDED P
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
BANNER FOR SONORA BARBERSHOP
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 28-FT X 48-FT 2026 ABOVE GROUND CLAYTON MANUFACTURED HOME, SERIAL NO. BUC017613AZAB WITH A/C AT REAR. NO GAS. UPGRADE ELECTRIC PEDESTAL. ONE ATTACHED 12-FT X 48-FT AWNING, ICCESR 4436. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE, ONE PARKING SPACE REQUIRED TO BE COVERED. 46-FT X 79-FT INTERIOR CORNER LOT. MIN
New 280 SF light gauge pergola with two posts, non energized, attached to the home measuring 23 by 4 by 12. Type V construction. R5 occupancy. No deferred items. No special inspections.
Like for like replacement of the 400amp (4) meter pak panel supplying power to units #13, #14, #15, & #16. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC.
Demolish existing tub, surround, plumbing fixtures, and drain assembly in main bathroom. Install new 60" × 34" low-profile left-drain preformed shower base, 96" high solid-surface shower wall surround with added cavity insulation if missing, plus sliding glass doors, three corner shelves, two grab bars, teak fold-away seat, and new shower valve with fixed head and handheld wand. No structural changes.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
New 2428 SF two-story residence with a two car garage in AVALON CROSSING. New gas, water and electric meter
Proposed Circle K convenience store with a vehicle fueling station at the Southeast quadrant of Pecos Road and Sossaman Road in Mesa, Arizona (Parcel ID 304-61-010C). The proposed Circle K will be constructed on a 1.9 acre lot. The development includes: • A 5,200 sq.ft. convenience store • 17 Standard parking spaces and 1 ADA parking space • A fuel canopy providing 6 fueling islands (12 fueling positions total) with underground fuel storage tanks • Associated landscaping, lighting and infrastruc