Search Permits
246,803 results
Bldg 3 New Construction of 2-Story Single Family Res [3bed 3.5bath] with attached carport
Homebuilders loop for New SFR ref 2026-062580 BP. Austin LTD -Bluebonnet
Construct new driveway approach of 17 FT and sidewalk of 28 LF
Bldg. 2: New construction of detached garage with dwelling unit above with 1 bedroom and 1 bath. New Driveway from alley
Bldg 2 New Construction of 2-Story Single Family Res [3bed 3.5bath] with attached carport
Interior Non-Structural Demolition REF: 2026-120928 PR
Replacement of complete existing central heat and air system with or without duct work Like for LIke 4 ton 2-stage vertical gas
Replacement of an existing water heater replace 30 gal electric water heater
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT & 88K BTU FURNACE CHANGE-OUT
Replacement of an existing water heater Replace existing tankless water heater with new tankless
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 1
Express - Shower Conversion
Demolition of an approximately 7800 sq. ft. warehouse and nightclub/bar structures currently unoccupied. Structures Circa 1967. 2026 089644 DA - Approved
Install Level 2 EV Charger
Construction of a new building addition and alteration to an existing two-story private club. Conventionally framed wood structure on a slab-on-ground steel-reinforced concrete slab.
Replacement of complete existing central heat and air system with or without duct work System changeout only
Install Level 2 EV Charger
Replacement of complete existing central heat and air system with or without duct work Install 5 Ton 16.5 Seer Straight Cool Electric System.
New pool Bldg 1
Homebuilders loop for New SFR ref 2026-054250 BP. Austin LTD -Bluebonnet
Replacement of complete existing central heat and air system with or without duct work
Temporary power for an event with temporary generators and distribution for stage vendors for plugs
Briscoe 820-Q-L Is a New one-story single-family residence with (3) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch and patio.
TEMPORARY ELECTRICAL PERMIT - Electrical underground work associated with the foundations for the Utility Plant for Project Toaster.
Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet and will cross uner driveway.
ePlan: Residential Expedited Review - SMALL LOT SINGLE-FAMILY RESIDENTIAL USE (SF-3) New construction of a 2-Story Single Family Res. [3bed 3bath] with Covered Porch and Attached Carport.
Stubbing out gas line so gas company can install gas meter to service home.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3bath] with Attached Carport. BLDG 1
160 feet of tunnel/repipe for Building 5
Replacement of an existing water heater 40 gal water heater change out 11017 Defender Trail Austin TX 78754