Search Permits
1,190 results · type: roofing
We are doing a like for like shingle replacement reroof
Work done to house and detached shed - like for like replacement of composition roofing on both buildings - plywood to be replaced on the shed.
8000 square feet recover existing roofing with torch down vapor barrier install R-36 ISO HD Board Fully adhered fleeceback PVC membrane
Scope of Work: Remove existing torch-down roofing material down to the existing substrate. We will also remove any rotten or damaged plywood. Install a new fully adhered PVC roofing membrane system. No structural modifications framing alterations or structural changes will be made to the building
Scope of work: Remove existing torch-down roofing material down to the existing substrate we will also replace any rotten or damaged plywood. Install new mechanically attach PVC roofing membrane system. no structural modifications framing alteration or structural changes will be made to the building.
residential re-roof Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Residential re-roof
Residential reroof only; no structural changes. Remove existing shingles and torchdown. Replace planned 23 sheets 1/2" CDX. Install Owens Corning Duration shingles for pitched roof sections and 60 mil PVC for low-slope roof sections.
Residential reroof only; no structural changes. Remove existing shingles. Replace 1 planned sheet of 1/2" CDX. Install Owens Corning Duration shingles.
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 36 sheets of 1/2" CDX. Install IKO Cambridge shingles.
Replacing roof with a new fortified roof Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Fortified Re-Roof PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: -Removal of existing roof material -Installation of water intrusion resistant underlayment -Installation of the drip-edge and flashing -Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email inspections
Remove existing roof & install new fortified roof w/ new decking. single family re-roof PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: -Removal of existing roof material -Installation of water intrusion resistant underlayment -Installation of the drip-edge and flashing -Installation of shingles or metal panels Once all applicable ph
re-roof with new Fortified roof $12,600 Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
1. Removal and Disposal: Remove, haul, tear-off, and dispose of one layer of the existing roof. 2. Roof Deck Nailing: Nail the existing roof deck with 8d ring-shank nails spaced at 4 inches on center per F-RR-3 standards. 3. Deck Sealing: Install deck tape on decking seams across the entire roof to enhance sealing. 4. Waterproofing: Install Weatherlock Owens Corning Ice & Water Shield per local building codes. Use WeatherLock® Mat Self-Sealing Ice & Water Barrier in valleys and around opening
Renovate roof structure and removal and disposal of old roof.
REROOF Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Three primary sections of roof to be re-roofed. Section A - One layer of existing roof with insulation. Needs overlay only. Section B - 2 layers of roof needs to be torn off insulation will be added to bring to R38 Section C - 2 layers of roof needs tear-off but no insulation added due to being unheated area.
Replace existing built up/torch-down roofing with new TPO Membrane roofing system on commercial building. Full tear-off and replacement
Washington Weather Shield will remove and properly dispose of a layer of existing roofing and install a new 60-mil GAF white TPO roofing system over 1/2" fanfold insulation. The project includes localized tongue-and-groove roof deck repairs installation of new roof drains scuppers edge metal and all required flashing and waterproofing details.
Roofing
Roofing
Remove old roof and install a new fortified roof Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Rear roof with asphalt shingles to fortified standards Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Upper Main Roof Shingle Section Only - remove all layers of existing roof to expose decking, Roof Redeck - Install a 1/2" dx plywood decking over the existing decking where the shingle roof has been removed, install a self-adhering 4" strip over all plywood joints in the roof decking, Install the high temperature water barrier underlayment in the valleys and other designated areas of the roof, install one ply of synthetic felt, install new drip edge around entire perimeter of roof, instal
Work done to house only like for like replacement of composition roofing with plywood being replaced.
TPO recover of existing roof no tear off
Roofing
Roof Replacement of a two family dwelling PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: -Removal of existing roof material -Installation of water intrusion resistant underlayment -Installation of the drip-edge and flashing -Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit,
Existing roof replacement