Search Permits
2,734 results · type: residential
2-story (fee-simple) Townhouses (per the 2024 IRC). Deferred fire sprinklers.
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 1: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 3 (CLUB HOUSE): New 1-story, type V-B construction, 4870 SF, group A,B,U occupancy. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers. Fire sprinkler monitoring to be submitted as a separate relat
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 4: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 5: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 6: New 3-story, type V-B construction, 43,163 SF, group R-2 occupancy, 36 unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers. F
Building 8 R-2 occupancy V-A construction 15348 SF 78 occupants 12 apartments 1 1/2" water meter 1 elect. meter. Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers (PMT22-06290C) and fire alarms (PMT22-06290B). Aerial apparatus access code modification: PMT23-13606. Civil work was completed in phase 1. Deferred fire sprinklers and fire alarm under PMT22-06290C and PMT22-06290B. As a result of C of O.
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 2: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
Building 7 R-2 occupancy V-A construction 15348 SF 78 occupants 12 apartments 1 1/2" water meter 1 elect. meter. Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. Civil work was completed in phase 1. Deferred fire sprinklers and fire alarm under PMT22-06290C and PMT22-06290B. As a result of C of O.
Related to COB25-00112. Existing 3,472 SF apartment building built in 1983 with fire damage requiring repairs under IEBC Chapter 4. Original construction type V-B. Occupancy R-1 occupancy converts to R-2. To repair or reconstruction of a property damaged by fire, ensuring compliance with local building codes, zoning regulations, and safety standards. Deferred trusses. (4) electric meters. Special inspection for wood construction. This permit is limited to fire damage repair and replacement only
Building 2: 3-story, type V-B construction, 32,966 SF, group R-2 occupancy and 5,383 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit. Deferred fire alarms and access control.
Entire project consists of 419-unit multi-family development comprising of (14) 3-stories buildings. Building 1: 3-story, type V-B construction, 32,966 SF, group R-2 occupancy and 5,383 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Water meters: (6) 2-inch and (5) 1 1/2-inch domestic: (1) 2-inch landscaping. Fire sprinkler plans provided. Deferred fire alarms and access control. (Pool, building signage, Play Equipment
Building 4 R-2 occupancy V-A construction 15348 SF 78 occupants 12 apartments 1 1/2" water meter 1 elect. meter. Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. See pmt23-14607 for civil work. Deferred fire sprinklers and fire alarm under PMT22-06290C and PMT22-06290B. As a result of C of O.
new pool enclosure on existing concrete footers for TBP pool permit #HC-BLD-26-0082651
instalaltion of an inground pool and paver deck
PANEL ROOF SCREEN ENCLOSURE 23 X 20
Install helical piers as supplemental support to foundation
Kitchen Remodel New wall oven and cooktop in design. Sink and Fridge stay in same locations
NEW SFR - LOT 54
CONSTRUCT NEW SFR INDIGO CREEK LOT 144 PH 2 *PP PR/INSP*
screen room mono slab
17311 Gunn Hwy, Odessa FL 33556
Installing new mobile home and connecting to existing well and septic tank
new pool enclosure on existing concrete footers for TBP pool permit #HC-BLD-26-0083300
Building a 2 bed 2 bath ADU with stem wall foundation, block walls and wood roof system.
Pool/Spa Install
Inground Gunite Swimming Pool
Installing a 30 Amp home run, Dock panel, wire lift and outlets and lights.
New constriction of townhome. One of eight unit building.
New construction of a one-story single-family detached residence (5,009 SF total) with attached garage, covered lanai, covered entry, and unfinished bonus room. Includes all structural, electrical, plumbing, mechanical, and associated site work per approved plans.