Search Permits
16,709 results · type: electrical
homebuilder loop refer to 2026 -127474 BP
Express: MASTER BATHROOM DEMOLITION DEMO ENTIRE MASTER BATHROOM TO REPAIR WATER LEAK; SHOWER SIZE WILL BE A 50X48 INCH SHOWER SPACE WITH GLASS ENCLOSURE. BATHTUB WILL BE REMOVED AND SMALL CLOSET OF 4X4 BUILT IN ITS PLACE NEW 84 INCH VANITY DOUBLE SINK WILL BE INSTALLED. ALL WATER LINES WILL BE UPGRADED TO PEX. WALL TILE WILL BE 100 SQ FT.
*Partial Demo* Interior remodel
ran dedicated circuit from main panel outside of garage through wall installed disconnect on outside wall next to mini split made final terminations installed two pole 20 amp Square D breaker
Emergency-Temporary Electrical wiring to reenergize occupied spaces until permanent repairs can be made as per Hyatt Dunn.
-change existingsmall garage door (2pcs 8 x 7) into a bigger garage motorized door (1 pc 17 x 7) 4 new recessed lights in the garage
ETJ- TEMP POWER
I have a customer that is having a Base battery system installed. They have a 125 amp service and there is no need to upgrade the Service. Simply need to replace the 125 amp meter socket with a new 200 amp AE meet socket. this is an underground service and hopefully the conductors are long enough.
Addition/ remodel to existing single family residential to include: convert existing screened porch to an accessory apartment (25-2-901); new attached 1-car carport covered porch outdoor circular stair; 2nd story addition to include: walk-in closest studio space balcony roof deck office and 3rd story roof deck. Interior remodel of existing master bedroom.
Express - Replace windows and exterior doors
PANDA EXPRESS S2 on south facade
Phase 1 Interior Remodel to Existing Floor 2 of Building 1
ETJ Disconnect/reconnect Existing meter service needs inspection per utility requirement to be re-energized after remodel
PANDA EXPRESS S4 on east facade
Install/Replace 200 amp main breaker panel and meter can (underground)
Service change on 2 services. Same address.
homebuilder loop Ref: 2026-123643 BP REF:
Upgrading the electrical service main distribution panel and revenue meter mast.
Disconnect/Reconnect service to install IQ Meter Collar associated with 2026-082283 EP
service upgrade
372 SF addition to an existing restaurant and remodel of existing building.
PANDA EXPRESS S1 on east facade
Install new 200a panel and make the existing main panel a sub panel . No increase to amperage or load. Approved ESPA attached. Will need disconnect/reconnect. ETJ
EMERGENCY REPAIR -- Replacing existing meter-loop with like-for-like due to high winds ripping meter-loop off the building..
homebuilder loop REF: 2026-123913 BP
Install Level EV Charger
New pool Bldg 2
*Green Building* New 2-story 4 bedroom 3 bathroom single family residence with attached garage covered front porch and rear covered patio.
rebuild existing service. install trans-socket meter 400 amps install new fuse disconnect
Wire addition and install new meter loop This permit to act as child permit for addition/remodel permit 2026-098625